Similar Projects
New T-Hangar - AIR-F-23-03 - City of Albert Lea
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Albert Lea, MN 56007

TH65 to 6th & St John Sewer Line Replacement - SCO-F-23-01 - City of Albert Lea
Infrastructure
Conception
$600,000 CJ est. value
Albert Lea, MN 56007

Cable Median Barrier Installation - TH 90
Infrastructure
Design
$1,200,000 CJ est. value
Albert Lea, MN 56007

Cable Median Barrier Installation - TH 90
Infrastructure
Design
$1,200,000 CJ est. value
Albert Lea, MN 56007

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2021 Stabilize And Pave Road Bed
Results
$1,002,500 est. value
MN

East Main Street Resurfacing - TH 65 to CSAH 38
Infrastructure
Results
Albert Lea, MN 56007

W 9th/Lincoln Avenue Sewer - SCO-F-26-01 - City of Albert Lea
Infrastructure
Conception
$180,000 CJ est. value
Albert Lea, MN 56007

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

Marshall Street and Sibley Avenue Reconstruction - STCON-23-02 - City of Albert Lea
Infrastructure
Conception
$1,680,000 CJ est. value
Albert Lea, MN 56007

Rental Equipment: Road Construction and Maintenance
Term Contract
Post-Bid
$1,500,000 to $2,000,000 est. value

Concrete Pavement Rehabilitation
Infrastructure
Results

900 Block Spicer Road Reconstruction - STCON-24-01 - City of Albert Lea
Infrastructure
Conception
$516,000 CJ est. value
Albert Lea, MN 56007

Last Updated 01/20/2023 08:31 AM
Project Title

Sunset Street Extension - STCON-25-01 - City of Albert Lea

Physical Address View project details and contacts
City, State (County) Albert Lea, MN 56007   (Freeborn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2027
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct 2,616 foot roadway from Lake Chapeau to TH13 including sanitary sewer, water and shared user path. This is tied to the Fountain Center Project and will remain a gravel road until construction is warranted. As of January 20, 2023, this project is currently in the City of Albert Lea 2023-2027 Capital Improvement Plan (CIP). Funding for this project is allotted in the County's capital improvement plan for construction FY 2027. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents