Similar Projects
Systemwide Emergency Tunnel Ventilation Fan and Damper Replacement - Los Angeles County Metropolitan Transportation Authority (LA Metro)
Renovation
Conception
$99,000,000 est. value
Los Angeles, CA

Salem Street Bridge Replacement - 50231 - City of Chico
New Construction, Demolition
Conception
$3,948,118 est. value
Chico, CA 95928

ArtCenter College of Design - Phase I
Demolition, New Construction, Infrastructure, Renovation
Design
$45,000,000 CJ est. value
Pasadena, CA 91103

O'Shaughnessy Dam Outlet Works Access and Drainage Improvements
Infrastructure
Design
$5,878,246 CJ est. value
Sonora, CA 95370

RFQ D/B - Tunnel to Ontario International Airport Project
Infrastructure
Bidding
$7,000,000 CJ est. value
Ontario, CA 91762

Friant Dam Drum Gate Corrosion Project
Renovation
Bidding
$5,000,000 CJ est. value
Fresno, CA 93721

Bishop Tract Levee Maintenance Project
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Stockton, CA 95214

Folsom Dam Raise: LRWD and Main Dam Construction
New Construction
Post-Bid
$100,000,000 to $250,000,000 est. value
Folsom, CA

Kansas and Marin Streets Wet Weather Conveyance Tunnel
New Construction
Results
$12,500,000 to $16,000,000 est. value
San Francisco, CA

Fairmount Park Weir Dam Repairs
Renovation
Results
Riverside, CA 92519

BF SISK Safety of Dams Modification Phase I
Infrastructure, Renovation
Construction
$119,973,750 CJ est. value
Los Banos, CA 93635

Lake Wohlford Dam Replacement - 704912 - City of Escondido
Renovation, Infrastructure
Pending Verification
$81,029,530 CJ est. value
Escondido, CA 92025

Sites Reservoir
New Construction, Infrastructure
Pending Verification
$4,000,000,000 CJ est. value
Maxwell, CA 95955

Sewer Capacity Improvement Projects - 315006 - City Of Morgan Hill
Renovation
Conception
$2,600,000 est. value
Morgan Hill, CA 95037

Bell Canyon Intake Tower Replacement - W-109 - City of St. Helena
Infrastructure
Design
$3,000,000 CJ est. value
Saint Helena, CA 94574

Last Updated 02/08/2023 03:16 PM
Project Title

Distribution PLC Upgrade Project - Phase 3

Physical Address View project details and contacts
City, State (County) Fremont, CA 94538   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $812,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

***As of February 8, 2023. Project has not been awarded yet. Anticapted award date will be on March 2023. The work consists of the following: Fabricate, program, and install four (4) new M580 PLC back panels at Washington Booster, Rancho Higuera Booster, Scott Creek Booster, and Avalon Tank; Fabrication and installation of one (1) new PLC cabinet, fabrication and installation of one (1) new UPS cabinet, fabrication, programming, and installation of one (1) new M580 PLC back panel and one (1) new UPS back panel, relocation of existing SCADA radio, and installation of housekeeping pad at FR1 Regulator; Fabrication and installation of one (1) new PLC/UPS cabinet, fabrication, programming, and installation of one (1) new M580 PLC back panel and one (1) new UPS back panel, relocation of SCADA components at FR2/PR2 Regulator; Fabrication and installation of one (1) new PLC cabinet, fabrication, programming, and installation of one (1) M580 PLC back panel, fabrication and installation of cabinet display panel, relocation of existing fiber optic cable at PR3 Regulator; Fabrication and installation of one (1) new PLC cabinet, fabrication and installation of one (1) new UPS cabinet, fabrication, programming, and installation of one (1) new M580 PLC back panel and one (1) new UPS back panel, relocation of existing SCADA radio at Mayhew Reservoir; and miscellaneous electrical, instrumentation, and site work. Number of Days: Three Hundred Fifty (350) calendar days Project City, State: Fremont, California Local District: ALAMEDA CTY WATER DI Engineer's Estimated Cost: $850,000 to $1,000,000 Pre-Qualification for Bidders: Not Required License Type Required: Valid Class A Contractors License by CA CSLB

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents