Similar Projects
Bank Stabilization Sewer Lift Station Site & Spring
Term Contract
Design
$100,000 to $250,000 est. value
Waynesboro, MS 39367

Polypropylene Culverts
Term Contract
Bidding
MS

Metal Culverts
Term Contract
Bidding
MS

Erosion Repairs at CR 8541
Post-Bid
MS 38829

Drainage Improvements at Tennis Courts/Aquatic Center
Post-Bid
Booneville, MS 38829

Slide Repair
Results
MS

Bank Stabilization on US 84 at the Fair River (Bridge Nos. 74.9A and 74.9B)
Results
MS

Culverts
Term Contract
Bidding
MS

Emergency Watershed Protection
Post-Bid
MS

East Pinebrook Drive Drainage Improvement
Results
Brandon, MS

US Highway 51 and Kapik Drive Transportation Improvements
Infrastructure
Bidding
Hernando, MS 38632

West Lincoln Attendance Center Football Field Grading and Drainage Improvements
Post-Bid
Brookhaven, MS 39601

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Emergency Watershed Protection Program - Apple Creek
Infrastructure
Bidding
Horn Lake, MS 38637

Vicksburg Waterline Protection Project
Post-Bid
Vicksburg, MS

Reported 12/04/2021 12:00 AM
Project Title

Mississippi Lake Operations and Maintenance

Physical Address View project details and contacts
City, State (County) Vicksburg, MS   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Set Aside 8(a):Variety of operations, routine and non-routine maintenance, repair, inspection, reconstruction, modernization and rehabilitation of project facilities, water control structures and features at four large flood control reservoirs managed by the U.S. Army Corps of Engineers.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents