Similar Projects
Water Meter and AMR/AMI Program
Infrastructure
Bidding
Addison, IL

Watermain Extension Timberlakes Unit F
Infrastructure
Bidding
IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Fire Hydrants
Post-Bid
Springfield, IL 62701

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

2020 Sanitary & Water Structure Rehabilitation
Renovation
Results
Lincolnshire, IL 60069

Grant Street Water Main Improvements
Infrastructure
Bidding
$275,590 est. value
Peru, IL 61354

Various Valves
Post-Bid
Benton, IL 62812

Water Service Line Replacements
Results
Oak Park, IL

Civic Apartments Water and Waste Line Replacement
Alteration
Bidding
Sycamore, IL 60178

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

2020 Water Main Replacement - East Cooper Drive
Results
Palatine, IL 60067

63rd Street Water Main Extension
Infrastructure
Bidding
Westmont, IL 60559

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Route 31 Water Main Relocation - Phase 2
Results
$1,000,000 to $2,000,000 est. value
South Elgin, IL 60177

Last Updated 07/20/2021 12:29 PM
Project Title

Water Valve Replacement

Physical Address View project details and contacts
City, State (County) Galena, IL   (Jo Daviess County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.Valves for replacement to be decided by City staff and US Water. 2.Remove existing valve and replace with new valve. Size to vary between 4 inch and 10 inch. Valve and fittings to be supplied by the city. 3.Install new valve at required location. Size to vary between 4 inch and 10 inch. Valve and fittings to be supplied by the city. 4.Trench backfill to valves to be ¾” clean stone (CA-7) topped-off with 10 inches of compacted CA-10. 5.If valve is situated in grass area include for minimum 4 inches of topsoil, grass seed and straw mulch. If valve is situated in street blacktop city will be responsible for reinstating blacktop (HMA). 6.City will be responsible for obtaining water samples for bacteriological testing if needed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents