Similar Projects
K-7 Building Addition - Brooke Charter School
Addition - 16,450 SF
Conception
Less than $1,300,000 est. value
Boston, MA 02131

Garden Cemetery - Phase 5 - City of Chelsea
New Construction, Infrastructure
Conception
$450,000 est. value
Chelsea, MA 02150

Harvard University Enterprise Research Campus
New Construction, Infrastructure - 61,500 SF
Design
$1,000,000,000 CJ est. value
Boston, MA 02134

Neponset Wharf
New Construction, Infrastructure - 38,400 SF
Design
$90,000,000 CJ est. value
Boston, MA 02122

RFQ Construction Management at Risk - Quincy Bus Maintenance Facility
New Construction, Infrastructure - 300,000 SF
Bidding
$280,187,831 CJ est. value
Boston, MA 02203

Dorchester Aboveground (AST) Storage Tank Replacement
Infrastructure
Bidding
$250,000 CJ est. value
Boston, MA 02122

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

Emergency and Regular Excavation Services
Term Contract, Infrastructure
Post-Bid
Boston, MA

Henderson Lower Windows Project - Filed Sub Bids
Renovation
Results
$5,136,141 est. value
Boston, MA 02124

Henderson Lower Windows - General Bids
Renovation
Results
$6,143,345 est. value
Boston, MA 02124

NEXUS at the Allston Innovation Corridor
New Construction, Infrastructure - 12,000 SF
Construction
$100,000,000 CJ est. value
Boston, MA 02134

South Bay Town Center
New Construction, Infrastructure - 178,000 SF
Construction
$200,000,000 CJ est. value
Boston, MA 02125

Hyde Park Avenue Residential Development
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Boston, MA 02136

Soldiers Field Road Residential Development
New Construction, Infrastructure - 14,500 SF
Pending Verification
$198,000,000 CJ est. value
Boston, MA 02135

Seaport Square Block L3
LEED Certification, New Construction, Infrastructure - 422,000 SF
Conception
$100,000,000 CJ est. value
Boston, MA 02210

Last Updated 09/14/2022 02:09 PM
Project Title

RFQ Contractor - Brooke Charter School Mattapan, K-7 School Project

Physical Address View project details and contacts
City, State (County) Boston, MA 02131   (Suffolk County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $10,500,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor Qualification DCAMM Certificate Request for Qualifications: Pre-qualification of Trade Contractors for the Brooke Charter School Mattapan, K-7 School Project: Trade Contractor Statement of Qualifications are sought from interested Trade Contractors for the following categories of work: Masonry (ECC $330,000); Misc. Mtls. (ECC $75,000); Waterproofing (ECC $90,000); Roofing (ECC $190,000); Tile (ECC $40,000); ACT (ECC $185,000); Resilient (ECC 150,000); Painting (ECC $70,000); Fire Protection (ECC $115,000); Plumbing (ECC $255,000); HVAC (ECC $1,350,000); Electr. (ECC $980,000). Sub Bid Category Masonry; Misc. Metals; Waterproofing; Roofing and Flashing; Resilient Flooring; Tile; ACT; Painting; Fire Protection; Plumbing; HVAC; Electr. Brooke plans to construct a new, 12,500SF, 3-story addition and renovate 6,500SF of it's K-7 school. The facility will be occupied during the 16-months of phased constr. starting April 2023. This RFQ is the first phase of a two-phase procurement process as set forth in M.G.L. c. 149A. Brooke through its Trade Contractor Prequal Committee is prequalifying firms interested in providing public Trade Contractor services on this Public CM at Risk project via this RFQ process. Brooke will evaluate submitted SOQs based upon the identified evaluation criteria and points set forth in the RFQ and only those firms obtaining the required minimum points will be deemed prequalified. Only those deemed prequalified will be invited to submit a bid in response to a RFB which will be issued in the second phase of the procurement process. The project delivery method for construction will be public CM at Risk with a GMP under M.G.L. c. 149A. The Arch. is Arrowstreet. The CM is Consigli. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 19,000 SF - 3 Stories Above Grade, 12,500 SF. 6,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents