Similar Projects
First Hill Apartment Tower
New Construction - 250,000 SF
Conception
$10,000,000 CJ est. value
Seattle, WA 98104

Shoreline 189 Multifamily Development
New Construction
Conception
Shoreline, WA 98133

800 Stewart
New Construction - 702,349 SF
Design
$10,000,000 CJ est. value
Seattle, WA 98101

Main Street Place Development
New Construction - 1,000,000 SF
Design
$380,000,000 est. value
Bellevue, WA 98004

Rehabilitation of Four (4) Water Damaged Units at Port Orchard Vista Apartments
Renovation
Bidding
$300,000 est. value
Port Orchard, WA 98366

Olympia Crest Apartments Phase III
New Construction
Bidding
$6,000,000 to $6,500,000 est. value
Olympia, WA 98506

Novo on 52nd
New Construction, Demolition - 232,000 SF
Post-Bid
Lynnwood, WA 98037

Lewis County Community Development Tenant Improvement
Renovation
Post-Bid
Chehalis, WA 98532

Frenchman Hills Mold Remediation, Roofing Replacement, and Ventilation Improvements
Renovation, Alteration
Results
Royal City, WA 99357

Cedarwest Apartments Unit Renovations
Renovation
Results
Spokane, WA 99205

Heron Rowhomes
New Construction - 7,755 SF
Construction
$1,000,000 to $5,000,000 est. value
Seattle, WA 98117

85th Rowtown Townhouses
New Construction - 37,104 SF
Construction
$5,000,000 to $10,000,000 est. value
Seattle, WA

BelleVista Place Mixed Use Development
New Construction
Pending Verification
Bellevue, WA

Affordable Housing Development
New Construction
Pending Verification
Tacoma, WA 98417

East Lake Apartments
New Construction - 34,986 SF
Conception
Seattle, WA 98101

Reported 07/20/2022 03:48 PM
Project Title

Edmonds Lutheran Church Field Apartments

Physical Address View project details and contacts
City, State (County) Woodway, WA 98020   (Snohomish County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected October 2023, Construction Completion Expected December 2024,
Bids Due View project details and contacts
Estimated Value $27,537,654
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 52 apartment units. As of July 12, 2022, this project is in the early planning stages, and received funding from the Washington state Department of Commerce. Information regarding the selection of an architect and general contractor has not been provided. Construction is anticipated to break ground in fall 2023 and be completed by 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, New Construction, 52 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents