Similar Projects
Mount Peace Cemetery Expansion
Alteration
Conception
Akron, OH 44303

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Girl Scouts STEM Center for Excellence / Peninsula
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Peninsula, OH 44264

Dooridge Drive Improvements
Infrastructure
Bidding
$2,700,000 CJ est. value
Twinsburg, OH 44087

Bridge Preservation - IR 77
Demolition, New Construction, Infrastructure
Bidding
$1,397,250 CJ est. value
Akron, OH 44320

Muskingum River Parkway Lock & Dam Irrms
Renovation
Post-Bid
$13,400,000 est. value

Statewide Dam Improvements
New Construction
Post-Bid
$24,800,000 est. value

Barlow Community Center Dam Improvements
Renovation, Infrastructure
Results
$170,389,857 est. value
Hudson, OH 44236

Demolition and Site Clearance
Demolition, Infrastructure
Results
Less than $50,000 est. value
Akron, OH 44301

Atterbury Boulevard Culvert Extension
Infrastructure
Construction
$67,473 CJ est. value
Hudson, OH 44236

White Pond Drive Mixed Use
New Construction, Infrastructure - 51,720 SF
Pending Verification
$75,000,000 CJ est. value
Akron, OH 44313

Wallhouse Inn
New Construction, Infrastructure - 66,870 SF
Pending Verification
$10,000,000 CJ est. value
Hudson, OH 44236

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Last Updated 11/11/2022 11:04 AM
Project Title

Crouse Pond Dam Improvements - City of Green

Physical Address View project details and contacts
City, State (County) Green, OH 44216   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $746,840 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Crouse pond dam was inspected by ODNR and determined to be structurally deficient which increases downstream flood hazard. Cleaning the dam of all trees and filling sinkholes is to take place in 2022. Reconstructing the spillway will take place in 2024. This project is included in the city's FY 2022-2026 Capital Improvement Program. As of November 11, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents