Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

Brush Prairie Baptist Church Addition
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Vancouver, WA 98662

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

Westside WWT Backflow Prevention Improvement
Infrastructure
Post-Bid
Vancouver, WA 98660

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Royle Road S 19th to 460 LF N of S 15th
Infrastructure
Results
$2,350,000 est. value
Ridgefield, WA 98642

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

NE 90th Circle Apartments
New Construction, Infrastructure
Conception
$27,500,000 CJ est. value
Vancouver, WA 98665

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements
Infrastructure
Design
$95,500 CJ est. value
Vancouver, WA 98660

Overlook Park Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Ridgefield, WA 98642

Last Updated 08/31/2022 11:11 AM
Project Title

SCTP MH 14-2594 Diversion

Physical Address View project details and contacts
City, State (County) Hazel Dell, WA 98665   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCTP MH 14-2594 Diversion The work consists of implementing traffic control; completing one sanitary sewer main point repair; modifications to an existing manhole; removing and replacing an existing concrete manhole channel and installing new hydraulic weir gates, asphalt roadway restoration, bypass pumping required to complete the work; and all other appurtenances to complete the work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents