Similar Projects
R1 N Basement Reno ABSL3 space - Small Construction Purchase Program (SCPP)
Alteration
Bidding
$96,000 est. value
Denver, CO 80204

Bryant-Webster Elementary School
Alteration
Bidding
$200,000 est. value
Denver, CO 80211

HVAC and Mechanical Products
Term Contract
Post-Bid

Myec Zuni Parking Lot and HVAC
Post-Bid
Denver, CO 80211

J041--OCC-Data Center A/C Repairs Pop: 11-20-2020 To 11-19-2021
Results
Denver, CO

Heat Exchanger Tube Bundles
Results

FY23 HVAC Air Filters for DFM
Alteration
Bidding
$120,000 est. value
Denver, CO

HVAC Air Filter
Post-Bid
Denver, CO

2011-124M14 SB267 R/R HVAC Systems Bldg ACDE CMHIFLPH3
Results
Less than $688,701 est. value
Denver, CO

2019-053M19 Refurb HVAC System B Building CMHIFL
Post-Bid
Less than $981,000 est. value
Denver, CO

Exhaust Fan Replacement
Results
$120,000 to $140,000 est. value
Denver, CO 80230

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Cooling System and DPF Repair Services
Results
Denver, CO

Multi School Exhaust Fan Replacement
Infrastructure
Post-Bid
Denver, CO 80223

CU Denver PN20-112394 - SCPP Only
Alteration
Results
$125,000 est. value
Denver, CO 80204

Last Updated 06/09/2022 12:59 AM
Project Title

Upgrade and Replace HVAC Systems - 690/700 Kipling Streets

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,205,130 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to modernize the HVAC distribution system in the buildings at 690 and 700 Kipling St. The HVAC distribution system in each building is comprised of central air handlers with fan powered VAV boxes that feed the perimeter offices and moduline VAV diffusers that cool the central open office spaces. The existing VAV units are 32 years old, have reached their end of useful life, and will be replaced. The project will be accomplished in 2 phases starting with 690 Kipling.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents