Similar Projects
Bridge Deck Overlay
Infrastructure
Bidding
$750,000 CJ est. value
Barnum, IA 50518

Bridge Deck Overlay
Infrastructure
Bidding
$750,000 CJ est. value
Barnum, IA 50518

Municipal Water Well Improvements
Infrastructure
Post-Bid
$1,131,320 CJ est. value
Dayton, IA 50530

HMA Sidewalk/Trail - Prairie River Trail
Infrastructure
Results
IA

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Poplar Avenue Traveler's Center
New Construction, Infrastructure - 10,000 SF
Pending Verification
$6,000,000 CJ est. value
Fort Dodge, IA 50501

Bridge Deck Overlay
Infrastructure
Bidding
$1,250,000 CJ est. value
Fort Dodge, IA 50501

Fort Dodge CSI Phase 2 - 10th Avenue North
Infrastructure
Results
$3,300,000 est. value
Fort Dodge, IA 50501

Roads - City of Fort Dodge
Infrastructure
Pending Verification
$141,450 CJ est. value
Fort Dodge, IA 50501

Hma Resurfacing with Milling
Infrastructure
Results
IA

Corridor Plaza - Plat 2
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Fort Dodge, IA 50501

PCC Patching
Infrastructure
Results

AML Riverside
Addition, Demolition, Infrastructure
Pending Verification
$11,100,000 CJ est. value
Fort Dodge, IA 50501

N. 1 St Street Reconstruction
Infrastructure
Results
$2,349,925 CJ est. value
Fort Dodge, IA 50501

Last Updated 02/14/2023 09:03 AM
Project Title

2023 PCC Patch Phase 2 Local Street Repair

Physical Address View project details and contacts
City, State (County) Fort Dodge, IA 50501   (Webster County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $194,941 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The 2023 PCC Patch Phase 2 Local Street Repair Project consists of removal and replacement of existing PCC pavement (1,000 SY, 8" PCC), curb and gutter removal and replacement, and other associated improvements. Improvement locations are along 1 st Ave. S and 28 th Ave. N in FortDodge. The work shall be commenced on or before a date to be specified in a written Notice to Proceed of the City, the project shall be substantially complete by dates as further described. All work shall be completed by July 14 th, 2023. The bidder must also agree to pay as liquidated damages the sum of Two Hundred Fifty dollars ($250.00) for each "per calendar" day thereafter. The successful bidder shall be required to furnish a Performance and Payment Bond in an amount equal to one hundred percent (100%) of the contract price, said Bond to be issued by a responsible surety approved by the City Council, and shall guarantee the faithful performance and the prompt payment of all materials and labor, and protect and save harmless the City from claims and damages of any kind caused by the operation of the contract, and shall also guarantee the maintenance of the improvements for the City for a period as required by the specifications, after its completion and acceptance by the City.Bid security other than said bid bond shall be made payable to the Treasurer of the City of FortDodge. "Miscellaneous Bank Checks", and personal checks, as well as Money Orders and Traveler's Checks issued by persons, firms or corporations licensed under Chapter 533B of the Iowa Code, are not acceptable bid security. The bid security must be in an amount equal to five percent (5%) of the total amount of the bid as security that if awarded a contract, the Bidder will enter into a contract at the prices bid and furnish the required performance and payment bonds and certificate of insurance. The Contractor will be paid each month ninety-five percent (95%) of the Engineer's estimate of the value of acceptable work. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. The City of FortDodge reserves the right to reject any and all bids, re-advertise for new bids, and to waive informalities that may be in the best interest of the City

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents