Similar Projects
Repairs to Mill Road Bridge
Bidding
Brentwood, NH 03833

Rehabilitation of the Whitter Covered Bridge Over the Beaucamp River
Renovation
Bidding
$800,000 to $900,000 est. value
Ossipee, NH 03864

Nature Trail Construction
Post-Bid
Claremont, NH 03743

Rehabilitation of Barn Door Gap Road Bridge over Big River (NHDOT Bridge No. 057/137)
Post-Bid
Strafford, NH

Roxbury Street Bridge Replacement
Results
Less than $1,400,000 est. value
Keene, NH

State Aid Highway Project NH Route 3A & Dunklee Road Intersection Improvement & State Aid Bridge Project Dunklee Road Bridge Rehabilitation Over Bow Bog Brook
Results
$1,800,000 to $2,100,000 est. value
Bow, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Lift Bridge PLC Services
Term Contract
Post-Bid
Concord, NH 03302

Bunker Hill Road Bridge Replacement over Mill Brook
Results
$500,000 to $550,000 est. value
Tamworth, NH

Reconstruction of the New Bridge Over the Connecticut River
New Construction
Bidding
$50,608,669 est. value
Hinsdale, NH

Electrical Inspection, Maintenance and Repair for Bridges
Post-Bid
Concord, NH 03302

Replacement of the Main Street Bridge over Contoocook River
Term Contract
Results
$4,900,000 to $5,400,000 est. value
Peterborough, NH

Expanding Polymer Injection
Post-Bid
Sanbornton, NH 03269

US Route 202 Reconstruction
Term Contract
Results
$4,450,000 to $4,950,000 est. value
Peterborough, NH

Dougherty Lane Bridge Repair over the Middle Branch Piscataquog River
Post-Bid
New Boston, NH

Last Updated 05/01/2020 09:14 AM
Project Title

Bridge Repairs - Market Street, Kearsarge Way Bridge Repairs

Physical Address View project details and contacts
City, State (County) Portsmouth, NH   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000 to $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of repairs to three bridges in the City of Portsmouth, NH. Market Street (EB and WB) over Tidal Basin work consists of replacing the expansion joint and installation of bridge approach rail. Kearsarge Way over Pan Am Railways work consists of repairs to the 2-span bridge, which generally consist of concrete bridge deck partial and full depth repairs, installation of a new barrier membrane, hot bituminous pavement, replacement of the expansion joint, and substructure concrete repairs. Recreation Trail over Market Street work consists of repairs to the 9-span bridge, which generally consist of concrete repairs to the piers, chain-link fence repairs including replacement of the chain-link fabric, and maintenance work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents