Similar Projects
Lake Street and Ornamental Streetlight Pole Painting
Alteration
Bidding
Addison, IL

Water Tower Painting and Miscellaneous Repair
Infrastructure, Alteration
Bidding
Woodridge, IL

Transmission Pole Painting
Post-Bid
Naperville, IL 60540

Electric Equipment Painting
Post-Bid
Naperville, IL 60540

Salt Creek Greenway Trail Pedstrian Bridge Painting And Staining
Renovation
Results
Wood Dale, IL 60191

Streetlight Pole Painting
Results
Elmhurst, IL

Painting Services
Post-Bid
IL

2021 Exterior Wall Repairs and Recoating
Results
Addison, IL 60101

250,000 Gallon Spheriod (East and West Water Tanks) Exterior Overcoat Painting
Post-Bid
Oak Brook, IL

Water Storage Tank Rehabilitation and Maintenance
Infrastructure
Results
Downers Grove, IL

Public Works Exterior Painting And Repairs
Renovation
Post-Bid
Wheaton, IL 60187

Transmission Pole Painting
Post-Bid
Naperville, IL

Underground Storage Tank Fill-In-Place
Post-Bid
IL

Museum Exterior Prepping and Painting
Post-Bid
Warrenville, IL 60555

Miscellaneous Painting
Post-Bid
Downers Grove, IL 60516

Reported 11/22/2021 12:02 PM
Project Title

Ground Storage Reservoirs Cleaning, Repair & Painting

Physical Address View project details and contacts
City, State (County) West Chicago, IL 60185   (DuPage County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Painting, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Booster No. 4 - Near intersection of East Forest Avenue and Bishop Street, West Chicago, IL Booster No. 8 - 1255 Helena Drive, West Chicago, IL Cleaning, repairing, and painting two 500,000-gallon ground storage reservoirs in the City of West Chicago. Both reservoirs require significant structure repairs in addition to replacing the interior and exterior coatings. The Booster No. 4 reservoir was constructed in 1959 by Graver. The Booster No. 8 reservoir was constructed in 1989 by Advance Tank Company. The project is scheduled to start with Booster No. 4 on March 7, 2022 and complete with Booster No. 8 on July 25, 2022. Under no circumstances will the City permit both tanks be offline at the same time. Booster Station #4 will be returned to operation before any work commences on Booster Station #8. 1. Cleaning, sandblasting, and painting interior and exterior surfaces. Full containment is mandatory. 2. Miscellaneous structure repairs. 3. Full replacement of the roof on Booster No. 4 and rafter replacement on Booster No. 8. 4. Welding and grinding to remove erection bracket scab marks, weld spatter, poor welds, and other surface irregularities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents