Similar Projects
Polk Street Improvements
Infrastructure
Bidding
$429,960 CJ est. value
Bedford, IA 50833

SE Trail Ridge Road Reconstruction
Infrastructure
Bidding
$1,830,000 CJ est. value
Grimes, IA 50111

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

2023 Street Repairs Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Polk City, IA 50226

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

2023 Street Construction Project
Infrastructure
Bidding
$700,000 CJ est. value
Cedar Falls, IA 50613

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

Time and Material (NTE), Commercial Plumbing Contracting
Term Contract
Post-Bid
Ames, IA 50010

Last Updated 03/03/2023 05:34 PM
Project Title

North River Valley Well Field and Pipeline Project

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,596,980 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located at 725 E 13th St, Ames, IA 50010 (North River Valley Park). As old wells fail and need to be replaced and as demand for treated water increases, additional water supply wells must be constructed. This project will provide a combination of new and replacement water supply capacity by the addition of three new wells and interconnecting pipeline to the water treatment plant. The project will also include new fiber optic communication conveyed to the water treatment plant for well controls and security measures. The three new wells, to be located north of North River Valley Park, will be connected to the existing standby generator located at the Water Treatment Plant to provide emergency power to the wells. In addition, a new security gate at the water pollution control lime ponds will be included in the scope of this project All bids shall be submitted to said City Clerk on or before the time set herein for the bid opening. Bids shall be made on the Bid Form furnished by the City of Ames, in a sealed and plainly marked envelope indicating it is a bid in response to this notice. Each bid shall include the bid security as defined in Code of Iowa Section 26.8 and as specified in the Instructions to Bidders. The City of Ames reserves the right to defer acceptance of any bid for a period not to exceed sixty (60) days after receipt of bids, and no bid may be withdrawn during this period. Each successful bidder shall be required to furnish a corporate surety bond in an amount equal to one hundred percent (100%) of its contract price. Said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement in good repair for a period of two (2) years from and after the completion and acceptance by the City. After award and approval of contract and performance bond, work on this contract shall substantially completed no later than September 27, 2024. The City does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City. As required by Iowa Administrative Code 875, Chapter 156, the bidder shall complete and submit the Bidder Status Form with its bid and certify its state or country of domicile by completing the address section of the Bid Form. By virtue of statutory authority, preference will be given to products and provision grown and coal produced within the State of Iowa, and to Iowa labor, to the extent lawfully required under Iowa statutes. For questions concerning the project specifications, please contact: Water & Pollution Control Department: Matthew Jacob, Environmental Engineer Phone: 515-239-5150 E-mail: matthew.jacob@cityofames.org HDR: Rob Baker, P.E. Ashley Geesman, EIT Phone: 515-280-4973 Phone: 515-280-4940 E-mail: rob.baker@hdrinc.com Email: ashley.geesman@hdrinc.com For questions concerning the bid procedures, please contact: Purchasing Division: Karen Server, Purchasing Manager Phone: 515-239-5127 E-mail: karen.server@cityofames.org

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents