Similar Projects
SH-20 - Bridge and Approaches
Infrastructure, Renovation
Conception
$2,751,704 CJ est. value
Hominy, OK 74035

Bridge and Approaches - SH 48
Infrastructure
Conception
$1,509,650 CJ est. value
Tupelo, OK 74572

Demolition of Old Police Station
Demolition, Infrastructure
Design
$12,000 CJ est. value
Lawton, OK 73501

Propane Tank Access Road Project on Behalf of the Otoe - Missouria Tribe
Infrastructure
Design
$1,000,000 CJ est. value
Red Rock, OK 74651

Grade, Drain, and Surface County Road (NS-199)
Infrastructure
Bidding
$4,886,233 CJ est. value
Freedom, OK 73842

Grade, Drain, and Surface County Road (NS-199)
Infrastructure
Bidding
$4,886,233 CJ est. value
Freedom, OK 73842

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Wyandotte Nation - Turtle Hill Estates Phase I
Infrastructure, Alteration
Results
Wyandotte, OK

Sidewalk and Curb Ramp Construction for CBDG / HUD Grant
Infrastructure
Results
$235,173 CJ est. value
Tulsa, OK 74103

Crest Fresh Market - Covell and Sooner / Edmond
New Construction, Infrastructure - 101,422 SF
Construction
$27,000,000 CJ est. value
Edmond, OK 73034

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

2019 Bond - Early Childhood Center - Muskogee Public Schools
New Construction, Infrastructure, Renovation
Pending Verification
$6,000,000 CJ est. value
Muskogee, OK 74401

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Conception
$10,000,000 CJ est. value
Norman, OK 73069

Last Updated 11/15/2022 03:15 PM
Project Title

Fire Training Vehicle Building Addition

Physical Address View project details and contacts
City, State (County) Enid, OK 73703   (Garfield County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Site Development, Vocational School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed competitive bid proposals will be received by the Construction Manager for Autry Technology Center, located at 1201 West Willow; Enid, Oklahoma for furnishing all necessary constructions, labor, materials and equipment for the Fire Training Vehicle Building Addition located at Autry Technology Center. Bid proposals received shall be in strict accordance with Specifications and Contract Documents which have been prepared by Easley Associates Architects. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays before the final time set for receipt of bids, as well as bids received after the final time set for receipt of bids, will not be considered and will be returned unopened. Bid proposals received will be summarized and presented to the Autry Technology Center Board of Education at their scheduled board meeting, located at the Autry Tech Board Room at 1201 West Willow; Enid, Oklahoma. It is the intent of the Board of Education to award and execute the contract(s) for construction at this meeting. The Contractor shall identify his Proposal on the outside of a sealed envelope by writing the name of the project, Bid Packet Number, and the name of the Proposer. No oral, telephone or telegraphic proposals will be considered. Plans and Specifications, Selection Criteria, Information for Proposers, Request for Proposal Form, Contract Form and Sample Bid Bond, Payment and Performance, may be examined without charge in the office of the Architect and in the Autry Tech Plan Room. Failure to do either as specified will forfeit the deposit. SubContractors and Material Suppliers may also obtain Plans and Specifications upon payment of reproduction and mailing charges. Plans and specifications are also on file at the Autry Technology Center "Plan Room", and construction news agencies in Oklahoma City, OK. Digital copies are available to subcontractors and suppliers upon request at no charge. All Contractors for the above listed work shall prepare and submit to the Construction Manager, Pre-Qualification Statement showing evidence that the Contractor has successfully completed work on projects of similar size and scope. Contractor's Pre-Qualification Statement shall list past projects, owners, architects and engineers with contact persons and telephone numbers. Business Relationships Affidavit, NonCollusion Affidavit and cashiers check, certified check, Surety Bid Bond, or an irrevocable letter of credit in the amount of five percent (5%) of the gross amount of the base bid as a guaranty shall accompany the sealed proposal of each bidder. The Owner reserves the right to reject any or all bids. No bidder may withdraw his bid within thirty (30) days after the actual date of the opening thereof. The successful bidders will be required to submit statutory Payment, Performance, Defect and Maintenance Bonds, or Letters of Credit in lieu of those bonds, proof of liability and workers' compensation insurance, prior to commencing work on the project. The awarded contract will contain a provision requiring the successful bidder to periodically provide during the performance of the Project a signed "Contractor Compliance Statement" declaring that no employee working on the school premises during normal school hours is convicted in this state, the United States, or another state of: (1) any sex offense subject to the Sex Offenders Registration Act or the Mary Rippy Violent Crime Offenders Registration Act in this state or similar law of another state's or the federal sex offender registration provisions; or (2) any unpardoned felony offense within the last ten (10) years. The prohibition against permitting employees convicted of a felony offense to work on school premises will not be applicable if the person is a volunteer or performing community service hours under a court order or performing services under a supervised work release program or when ten (10) years have elapsed since the date of the criminal conviction or if the employee has received a pardon for the criminal offense. The successful bidder will be required to obtain signed "Subcontractor Compliance Statements" from all subcontractors on the project. The submission of executed compliance statements will be a condition to receiving periodic and final payments on the contract sum. For purposes of your bid, do not include any local or state sales tax. The Owner will appoint the successful bidder its agent for the purpose of receiving tax exempt status on purchase of materials for this Contract only. Authority Oklahoma Statute Article 68 Paragraph 1356, 1983.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents