Similar Projects
Whispering Fields
New Construction
Design
Farmington, MN 55024

Peltier Reserve
New Construction - 322,800 SF
Design
$10,000,000 CJ est. value
Inver Grove Heights, MN 55077

Single Family Homes - New Construction Project
New Construction, Infrastructure
Bidding
$103,794 CJ est. value
New Prague, MN 56071

Install Load Bank Connection at the Senate Building
Alteration
Post-Bid
$82,170 est. value
Saint Paul, MN 55155

LED Lighting Supplies
Infrastructure
Post-Bid

Downtown Electric Distribution Conversion
Results
Less than $500,000 est. value
Jackson, MN

Fridley Campus Electrical Rehabilitation-Switchgear
Results
Minneapolis, MN

Canvas Housing Development
New Construction
Construction
Inver Grove Heights, MN 55076

Big Sky Estates Second Addition Site Development
New Construction
Construction
Savage, MN 55372

Willowbrooke Neighborhood
New Construction - 1,300 SF
Pending Verification
Oakdale, MN 55128

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Fox Meadows Residences
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Eagle Lake, MN 56024

Twin Cities Habitat For Humanity
Renovation
Post-Bid
Saint Paul, MN

Electrical Service Work
Term Contract
Results
$250,000 est. value
Moorhead, MN

Erhart Farm Residential Development
New Construction, Infrastructure
Pending Verification
Chanhassen, MN 55317

Last Updated 08/10/2022 08:35 AM
Project Title

FY2023 Small Projects - Electrical

Physical Address View project details and contacts
City, State (County) Onamia, MN 56359   (Mille Lacs County)
Category(s) Residential, Single Trades
Sub-Category(s) Electric, Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Mille Lacs Band of Ojibwe, Community Development, is seeking proposals from qualified Electrical Contractors for Time and Material Service Contracts. This service contract shall be a one year contract to be utilized by Community Development/ Housing Department for multiple small residential projects. This will help to eliminate the delays often encountered with small service contracts, and will decrease the amount of administrative time spent on small projects. Projects to be covered under the annual contract will be small residential projects; or service calls deemed to be emergencies; and TRR Rehab jobs. When possible the contractor will provide the Mille Lacs Band Community Development staff with a cost estimate prior to performing any work. Also, if the Contractor begins work on a project and encounters a substantial change in the projects work scope, the Contractor is responsible for notifying the Mille Lacs Band as soon as possible and prior to performing any work not already approved. The Contractor may be called and dispatched to a project at any time. The Contractor is expected to provide service in a timely manner. Contractor is responsible for contacting Toby Egan, Mille Lacs Band Building Official, on each project to determine whether or not a permit will be required. Contractors are responsible for securing all applicable permits and supplying the Mille Lacs Band with copies of any inspections conducted and will not be paid without this documentation. Upon approval of proposals, a Service Contract shall be awarded for a one-year period ending September 30, 2023 for an amount not to exceed $60,000.00. There may be one or two service contracts awarded depending on how many proposals are received to provide service to each district. Depending on necessity less than the awarded contract amount may be used for the year. In the event that additional dollars need to be added to the service contract, the Contractor agrees to continue providing service at the rates provided in their original proposal. Contractor shall have the responsibility to keep accurate records for the project and submit invoicing to Community Development. Each invoice must be itemized and reference: the actual date of service; number of hours and rate charged for labor; and a detailed list of materials and supplies used, as well as, (when possible) proof of price that the contractor paid for materials to verify the percentage of mark-up. Invoice amount will be verified, paid, and deducted from the total contract amount. Your proposals shall include the following: 1. Standard Labor Rate: Submit all labor rate levels that may be charged. 2. Which MLBO Districts you will work in: District I (Onamia), District IIA (Isle), District II (Aitkin, McGregor, East Lake), District III (Hinckley, Lake Lena) and Urban Area. Proposals may be selective or to provide service to all districts. 3. Trip Charge Rate, if applicable, or flat labor rate for travel. 4. Material Mark-up Percentage. 5. Profit and Overhead Percentage. 6. Provide a signed proposal including all of the above information. This will be used in lieu of the MLBO Schedule of Values form and in addition to the standard MLBO bid form. On the bid form please reference the following: a. Job/Project: FY2023 Small Projects: Electrical b. On the labor and materials bid lines, reference the attached Proposal with the rates and percentages required. c. Include all other MLBO Bid Attachments as required on the General Bid Form. 7. A copy of current MLB Vendors License. (Or copy of submitted application) 8. A copy of current certificate of insurance. 9. Copy of an authorized signature sheet if not already on file with the Mille Lacs Band. The Band reserves the right to reject any bid that it is unable to collect at the Onamia post office by the bid deadline date and time, provided that the Band has made diligent and reasonable efforts to collect the bid. The Band reserves this right even in the event that the bid has been postmarked before the deadline. Please note that the bids submitted via mail to the P.O. Box. FedEx and UPS will not deliver to a P.O. Box and the Onamia post office will not accept hand delivered items. Please plan accordingly to ensure the timely receipt of your bid submittal. If you have any questions or need additional information, please contact Mark Goede at (320) 532-4654, or via email at d1housing.maint@millelacsband.com 1. Contractors must have a current Mille Lacs Band Vendors license. Call Elizabeth Thornbloom with any questions 320-532-8274, or email at EThornbloom@grcasinos.com 2. Contractors must possess a valid Minnesota Contractors License. I agree to hold this bid open for a period of 60 days after the bid opening. If this bid is accepted I agree to execute a Contract and/or a Purchase Order with the Mille Lacs Band of Ojibwe along with furnishing all required bonding (if required) and insurances. Failure to provide any of these attachments will result in bid disqualification. Community Development Reserves the Right to Reject Any and All Bids for Any Reason.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents