Similar Projects
East Fork Pedestrian Bridge
Post-Bid
$1,063,855 est. value
Jamestown, NC

Intersection and Parking Lot Improvements
Post-Bid
High Point, NC

Keeley Park Mountain Bike Trail Project
Results
Greensboro, NC

Highway 150 Walkway Improvements
Results
Oak Ridge, NC

Sidewalk Enhancement Project, East Main Street Sidewalk
Post-Bid
Jamestown, NC

Friendly Avenue Sidewalk Improvements Part A
Results
Greensboro, NC

Lewis Community Center - Civil ADA Upgrades
Post-Bid
Greensboro, NC 27455

English Street Sidewalks
Results
Greensboro, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

2019 Resurfacing Curb Ramps Installation
Results
Greensboro, NC

Concrete Sidewalk Repair
Post-Bid
Greensboro, NC

Lindsay Street and Holden Road Sidewalk Improvements Safe Routes to School
Results
Greensboro, NC

Latham Park Greenway
Post-Bid
Greensboro, NC

Holden Road Sidewalk
Results
Greensboro, NC

Resurfacing Streets Part 2
Post-Bid
Greensboro, NC 27401

Last Updated 07/18/2019 09:02 AM
Project Title

General Sidewalks Improvements

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This contract includes construction of approximately 675 square yards (SY) of 4" of concrete sidewalk, 75 square yards (SY) of 6" concrete driveways, and 13 concrete curb ramps. Additionally, approximately 630 SY of existing 4" concrete sidewalk will be removed and replaced, 25 SY of existing 6" concrete driveways will be removed and replaced, and 3 existing concrete curb ramps will be removed and replaced. Also, asphalt paving will be required on O`Connor Street. The work is to take place along the following streets: 1) Mayflower Drive and Cobb Street 2) Holders Road 3) Van Wert Street 4) O’Connor Street All materials and workmanship shall be in accordance with all reference plans and specifications herein.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents