Similar Projects
Last Updated | 07/08/2023 02:31 PM |
Project Title | Upper Rodeo Gulch Sewer Rehabilitation Project |
Physical Address | View project details and contacts |
City, State (County) | Santa Cruz, CA 95060 (Santa Cruz County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $5,779,510 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project location in the County of Santa Cruz is as follows: Along Rodeo Gulch from Soquel Drive to Capitola Road Work includes rehabilitating sewer lines, lining existing manholes, replacing frame and lids, and inspecting and rehabilitating structural members of steel pipe bridge. Complete the work within 260 working days. The project is approximately 1.5 miles long and includes two separate sewer sections: The upper section runs parallel to Rodeo Gulch Creek from Soquel Drive to just north of Capitola Road; the lower section runs mostly along surface streets from a private road in a mobile home park (APN 028-021-07) to the Rodeo Pump Station on Richmond Drive The proposed project involves rehabilitating two deteriorated sections of an existing sewer main (Rodeo Gulch trunkline), repair and rehabilitation of a steel trestle sewer pipe bridge, and installation of an auxiliary wet well at the existing Rodeo Pump Station. The existing sewer system has structural defects in pipes, joints, manholes and other connections caused by age and deterioration that need to be repaired. The steel trestle pipe bridge has damaged frame members that require replacement and deteriorated paint that needs to be rehabilitated to prevent further damage to the structure. The work will be implemented as three separate construction projects: The Upper Rodeo Gulch Trunkline Rehabilitation will use a trenchless pipe lining method (cured-in-place pipe) to rehabilitate the existing underground pipe with minimal surface disturbance, and repair/repaint the existing pipe bridge. Some small segments of pipe will require replacement through conventional (open cut) trenching. The Lower Rodeo Gulch Trunkline Replacement will replace existing pipe using conventional trenching within paved roads and other previously disturbed areas, and the Rodeo Pump Station Capacity Upgrade will install a wet well within a paved area at the existing pump station. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |