Similar Projects
SR 20 From SR 100 to SR 1
Infrastructure
Design
$7,000,000 est. value
Rome, GA 30149

Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services
Infrastructure
Bidding
$400,000 est. value
Rome, GA 30161

Site Improvements for Rome Fire Department Burn Building
Post-Bid
Rome, GA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

8.092 Miles of Milling, Inlay and Plant Mix Resurfacing on Us 27/SR 1 Loop Beginning North of SR 1 and Extending North of Sr 156
Results
GA

The Varsity / Rome
New Construction, Infrastructure - 4,449 SF
Post-Bid
$2,250,000 CJ est. value
Rome, GA 30161

6.653 Miles of Milling, Inlay and Plant Mix Resurfacing on US 411/SR 20 Beginning West of Chateau DR and Extending to the Bartow County Line
Infrastructure
Results

East 14th Street Roadway Improvements
Infrastructure
Results
Rome, GA 30161

T32-D6-PPV-Edge Rut-Floyd-126024
Infrastructure
Results
GA

GSD Infrastructure Renovation
Infrastructure, Alteration
Results
Cave Spring, GA 30124

Resurfacing Riverside Parkway And East 1St Street
Alteration
Results
Rome, GA

Car Rider Lane Addition for Armuchee Elementary School
Infrastructure
Results
$620,000 est. value
Rome, GA 30165

Last Updated 08/01/2022 04:09 PM
Project Title

Driveway Improvements for Model Elementary, Middle, and High School

Physical Address View project details and contacts
City, State (County) Rome, GA 30161   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 01, 2022, project is cancelled. No definite date for the rebid.** No bid may be withdrawn for a period of thirty (30) days after bids are opened. Bid bond in the amount of five percent of the base bid is required and must be submitted with the bid. A bid bond is the only acceptable form of bid security. No personal checks, cashier's checks, certified checks or cash will be accepted in lieu of the bid bond. Performance and payment bonds in the amount of one-hundred percent (100%) of the contract sum will be required prior to commencement of construction. All bonds shall be written by a surety licensed to conduct business in Georgia, listed on the Federal Register and acceptable to the Owner. Owner reserves the right to waive technicalities and irregularities and to reject any or all bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents