Similar Projects
Murphy Express #8899
New Construction - 2,800 SF
Conception
Denver, CO 80247

Murphy Express #8641
New Construction - 2,800 SF
Conception
$500,000 to $1,000,000 CJ est. value
Aurora, CO 80011

Murphy Express #8994
New Construction - 2,800 SF
Design
Littleton, CO 80122

Murphy Express #8995
New Construction - 2,800 SF
Design
Canon City, CO 81212

Murphy Express #8855
New Construction - 3,445 SF
Bidding
$500,000 to $1,000,000 CJ est. value
Littleton, CO 80127

Maverik C-Store - Colorado Springs
New Construction - 4,425 SF
Post-Bid
$5,381,000 est. value
Colorado Springs, CO 80920

7-Eleven #41865
New Construction - 4,237 SF
Post-Bid
Lakewood, CO 80226

Murphy Express #8898
New Construction - 2,800 SF
Construction
Parker, CO 80134

7-Eleven
New Construction - 7,200 SF
Construction
$1,000,000 est. value
Castle Rock, CO 80104

QuikTrip #4213 - Thornton
New Construction - 4,933 SF
Pending Verification
Thornton, CO 80233

Kum & Go Convenience Store #2329
New Construction - 5,600 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Castle Rock, CO 80104

Kum & Go Convenience Store and Fuel Station
New Construction - 4,000 SF
Conception
Fort Collins, CO 80525

Murphy Express #8966
New Construction - 2,800 SF
Design
$500,000 to $1,000,000 CJ est. value
Longmont, CO 80501

QuikTrip #4216 - Bennett
New Construction - 7,318 SF
Post-Bid
Bennett, CO 80102

Murphy Express #8947
New Construction - 2,800 SF
Construction
Lakewood, CO 80215

Last Updated 06/02/2022 11:03 AM
Project Title

Murphy Express #8904

Physical Address View project details and contacts
City, State (County) Arvada, CO 80007   (Jefferson County)
Category(s) Commercial
Sub-Category(s) Gas Station
Contracting Method Bids by Invitation.
Project Status Construction Documents, Bidding Expected June 2022, Construction Start Expected September 2022, Construction Completion Expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Gas Station, 1 Story Above Grade, Approximately 2,800 SF New Construction 8 Fuel Pump(s).
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents