Similar Projects
Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Well No. 21 (Division A)
Bidding
Normal, IL

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Well No. 21 (Division B)
Bidding
Normal, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

Well 6 Repairs
Bidding
Antioch, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Last Updated 08/20/2020 09:22 AM
Project Title

Ejector Pump at Fairfield ES

Physical Address View project details and contacts
City, State (County) Chicago, IL 60629   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials necessary to install a fully functioning ejector pump as follows: Install (1) new 3”, 230V, 2 HP, 1 PH ejector pump with approximately 10’ of 3” copper pipe, (1) 3” ball valve, (1) 3” male adapter, (1) 3” soil adapter, (1) 3” union (1) 3” 90 and (1)3” 35. Install (1) new Nema 4x simplex control panel equipped with (3) mechanical float switches. Install (1) 2” 110 volt submersible ejector pump including a integral switch to serve as a back-up pump providing approximately 10’ of new 2” copper pipe, (1) 2” ball valve, (1) 2” union, (1) 2” 90, (2) 2” male adapters, (1) 2” swing check and (1) 2” 45. Furnish and install (1) 208V feed and (1) 120V feed from utility vault from the main building to the boiler room (approximately 300’+). -Replace damaged disconnect with 2 pole and provide, NEMA 3R weatherproof disconnect switch. Replace damaged 120V receptacle, and provide conduit and wire with new GFCI receptacle in weatherproof box.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents