Similar Projects
Last Updated | 04/22/2021 11:35 PM |
Project Title | Glendale Municipal Airport Taxiway Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Glendale, AZ (Maricopa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitation of Taxiway ‘A’, realignment of connector Taxiways ‘A4’ and ‘A6’, removal of Taxiway ‘A5’, removal of the hold bay near Taxiway ‘A8’, and taxiway shoulder stabilization. This project is divided into a Base Bid and two Additive Alternate Bids. The Base Bid involves milling and overlaying 4,100 linear feet of Taxiway ‘A’ and constructing the associated 15-foot-wide stabilized shoulders. Additive Alternate Bid 1 involves milling and overlaying the remaining 2,840 linear feet of Taxiway ‘A’ and constructing the associated 15-foot-wide stabilized shoulders. Additive Alternate Bid 2 involves demolishing existing Taxiways ‘A4’, ‘A5’, and ‘A6’ and constructing the realigned Taxiways ‘A4’ and ‘A6’ with 15-foot-wide stabilized shoulders. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |