Similar Projects
Pharmacy and Laboratory Hood Maintenance and Certification Rooms and Hoods at FM/HS - BH
Term Contract
Design
Hot Springs, SD 57747

Law Enforcement Center Chiller Replacement
Alteration
Bidding
$700,000 est. value
Sioux Falls, SD 57104

Air Conditioning Units/HVAC in the Hill City Elementary School
Post-Bid
Hill City, SD 57745

Air Conditioning Installation South Park Elementary School
Post-Bid
Belle Fourche, SD 57717

Aquatic Center HVAC Replacement
Renovation
Results
Pierre, SD 57501

Replace Radiant Heaters Human Services Center
Results
Yankton, SD 57078

HVAC Preventative Maintenance/Service
Post-Bid
Spearfish, SD

Beulah Williams Library Heating System
Results
Aberdeen, SD 57401

Install Ionization Units Flandreau Indian School
Post-Bid
Flandreau, SD

Highway Maintenance Building Exhaust System Improvements
Results
Less than $200,000 est. value
Canton, SD

Brown High School Indoor Air Quality HVAC Upgrade Project
Alteration
Post-Bid
Sturgis, SD 57785

Dacotah Hall HVAC Upgrades
Results
Aberdeen, SD 57401

Make-Up Air Unit - Design/Purchase/Installation
Alteration
Post-Bid
Mitchell, SD 57301

Meadows South Building Skin and HVAC Repairs
Results
Brookings, SD 57007

Chiller Service Agreement
Term Contract, Alteration
Post-Bid
Brookings, SD

Last Updated 09/30/2021 12:42 PM
Project Title

Z--Sources Sought-Market Survey-Energy Plant HVAC Upgrade for Mount Rushmore

Physical Address View project details and contacts
City, State (County) Keystone, SD   (Pennington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing three 2,000,000 btuH Weil-McLain cast-iron section boilers with LPG Power flame burners and three (Taco) dedicated internal circulators; two (Taco) campus heating-pump circulating systems; Trane 100-ton helical rotary screw chiller condensing package (twin compressors) with remote tube-bundle heat-exchanger; two (Taco) campus cooling-pump circulating systems; two building-interconnect utility tunnel/manways (concrete). All supply and return chilled and heated water piping, refrigerant piping, valves, expansion tanks, air vents, dampers actuators, etc. Renovations will include installing new chiller with remote evaporator, two-chiller pumps, two condensing boilers, heating water pumps, two-unit heaters, two building-interconnect utility tunnel/manways (concrete). All supply and return chilled and heated water piping, refrigerant piping, valves, expansion tanks, air-vents, dampers, actuators etc.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents