Similar Projects
Ting Stadium Structure and Drainage Repair
Renovation, Infrastructure
Bidding
Holly Springs, NC 27540

Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Streambank Repairs
Results
Raleigh, NC 27604

Stormwater Drainage Assistance Program
Results
Less than $120,888 est. value
Raleigh, NC 27602

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Stream Bank Repairs
Results
Raleigh, NC 27601

Streambank Repairs (Formal)
Post-Bid
Raleigh, NC

Corrugated Metal Pipe for Stone Creek/Bear Garden Project
Results
Raleigh, NC 27699

Stormwater Drainage Assistance Program - Bundle Project 3
Post-Bid
Less than $381,000 est. value
Raleigh, NC 27612

Culvert Maintenance
Results
Apex, NC

Stormwater Drainage Assistance Program - 904 Wakestone Court
Post-Bid
Raleigh, NC

Falls Lake Bulkhead Repairs
Results
$100,000 to $250,000 est. value
Wake Forest, NC 27587

Sierra Drive Drainage Improvements
Post-Bid
Raleigh, NC 27603

Aluminum Pipe Liner
Results
Cary, NC 27513

Last Updated 11/15/2021 08:23 AM
Project Title

Ting Stadium Structural and Drainage Repair

Physical Address View project details and contacts
City, State (County) Holly Springs, NC 27540   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services is separated into three areas; the concourse, stadium seating and the club house. This work includes but is not limited to: Removal of pavement coating. Repair slab cracks. Install repair products. Repair the joints between walls and stairs and install waterproofing products. Removal of existing expansion joint material. Install new expansion joint material and caulk/seal the joint. Repair leaks. Painting.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents