Similar Projects
Reported | 09/21/2021 12:00 AM |
Project Title | Construction Variable Width Pavement Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | East Dundee, IL (Kane County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Location: Park Street, Aberdeen Drive, Deerpath Road, Crestwood Drive, and King Avenue in East Dundee, IL Const. Variable Width Pav`t Resurfacing w/ Hot-Mix Asph. Surf. Cse., Mix "d", n50 (798 Ton), Incl. 496 Ton Leveling Binder (Machine Method), n50, 4648 Lbs Bit. Mat`l. (Tack Coat), 680 Lin Ft Comb. c&g, Type m3.12, 1 l Sum Traffic Control & Protection, Std. 701501, 120 Sq Yd Of Topsoil Placement, And Seeding, Class 1 a, Etc. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |