Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

City of Folsom Greenback Sewer and Lift Station Improvements Project
Renovation, Infrastructure
Bidding
$2,249,000 CJ est. value
Folsom, CA 95630

Braemar Lift Station Rehabilitation Project
Infrastructure
Bidding
$5,100,000 CJ est. value
Santa Barbara, CA 93109

Clamps FRP Pipe Repair Stainless Steel
Infrastructure
Sub-Bidding
$79,953 CJ est. value
Los Angeles, CA 90012

Drinking Fountain Removal and Replacement Services - Employment Development Department (EDD)
Renovation
Sub-Bidding
$75,000 CJ est. value
Vallejo, CA 94590

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

Plumbing Contractor Services
Term Contract
Post-Bid
Concord, CA

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Well No. 15 Test Hole
Infrastructure
Bidding
$398,050 CJ est. value
Chowchilla, CA 93610

Pipe Insulation
Renovation
Sub-Bidding
$400,000 CJ est. value
Vacaville, CA 95687

General Construction Services
Renovation, Alteration
Post-Bid
CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Folsom Area Stormwater Improvements - Soma and Mission Districts Sewer Replacement
Infrastructure
Bidding
$8,200,000 CJ est. value
San Francisco, CA 94103

Last Updated 01/27/2023 04:09 AM
Project Title

Bottle Filling Stations Installation

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93101   (Santa Barbara County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Liquidated Damages $100/Day Bid Bond 0.00% Payment Bond 100.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline 01/18/2023 12:00 PM (PST) Installation of Bottle Filling Stations at Oak Park & Stevens Park. In accordance with Civil Code 9550, if the bid exceeds $25,000, the Successful Bidder shall furnish within ten (10) consecutive calendar days after written Notice of Award, a Payment Bond in an amount equal to one hundred percent (100%) of the total amount of the bid. SCOPE OF WORK - OAK PARK 1. Remove existing drinking fountain (See Attachment A) and transport to the City yard. 2. Assemble the owner-supplied bottle filling station using the Owner's Manual (See Attachment C) instructions. 3. Lay out the anchoring points onto the existing concrete slab. Provide and install stainless steel Hilti drop-in anchors with stainless steel hardware. 4. Install the bottle filling station, securing it onto the existing concrete slab. Shim the base of the station to allow it to be installed level and plumb. 5. Dy pack under the base of the station. 6. Complete the final plumbing connections onto the existing service piping. 7. Test and inspect the completed installation. Clean up the work area and transport the debris generated by the project to the recycle center. 5.3 SCOPE OF WORK - STEVENS PARK 1. Install piping from existing water main line. 2. Install a French drain that is 24" length x 24" wide x 24" deep underneath where the bottle filling station will be installed. Fill the drain with 3/4 " gravel. 3. Install a concrete pad that is 52" length x 36" wide x 7" deep, between the restrooms and the playground. The concrete pad will go next to the sidewalk in the planter bed. See map (See Attachment B). Install a sleeve in the concrete pad for drainage. 4. Lay out the anchoring points onto the existing concrete slab. Provide and install stainless steel Hilti drop-in anchors with stainless steel hardware. 5. Assemble the owner-supplied bottle filling station using the Owner's Manual (See Attachment C) instructions. 6. Install the bottle filling station, securing it onto the concrete slab. Shim the bases of the station to allow it to be installed level and plumb. 7. Dry pack under the base of the station. 8. Complete the final plumbing connections onto the service piping. 9. Test and inspect the completed installation. Clean up the work area and transport the debris generated by the project to the recycle center.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents