Similar Projects
Hinsdale Road Reconstruction - City of Fayetteville
Infrastructure
Conception
$1,394,724 CJ est. value
Fayetteville, NC 28305

Little Cross Creek Greenway - Phases I and II - City of Fayetteville
Infrastructure
Conception
$510,000 CJ est. value
East Fayetteville, NC 28301

Hyatt Place Hospitality Development / Fayetteville
New Construction, Infrastructure - 216,388 SF
Design
$20,000,000 CJ est. value
East Fayetteville, NC 28301

O'Reilly Auto Parts (FV6) / Fayetteville
New Construction, Infrastructure
Design
$400,000 CJ est. value
East Fayetteville, NC 28301

Phase V Annexation Project XII Area 26 Cliffdale West Subdivision Volume I and II
Infrastructure
Bidding
$5,000,000 CJ est. value
Fayetteville, NC 28314

Phase V Annexation Project XII Area 26 Cliffdale West Subdivision Volume I and II
Infrastructure
Bidding
$5,000,000 CJ est. value
Fayetteville, NC 28314

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sheetz - Site Only
New Construction
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Fayetteville, NC 28314

Bryant Hall and Vance Hall Building Asbestos Abatement, Demolition and Site Restoration Project
Demolition, Infrastructure, Alteration
Results
Fayetteville, NC

Water Main Extension Project
Infrastructure
Results
$1,665,690 CJ est. value
Godwin, NC 28344

Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Construction
$151,850,000 CJ est. value
Fayetteville, NC 28306

Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Construction
$151,850,000 CJ est. value
Fayetteville, NC 28306

Taxiway F Pavement and Lighting Rehabilitation - City of Fayetteville
Infrastructure
Conception
$4,000,000 CJ est. value
Fayetteville, NC 28306

RFQ/P D/B - Ann Street MSW Landfill Transfer Station
New Construction, Infrastructure - 12,900 SF
Bidding
$6,000,000 CJ est. value
East Fayetteville, NC 28301

PN92793 JSOC (Joint Special Operations Command ) Operations Facility Annex
New Construction, Infrastructure - 25,260 SF
Post-Bid
$25,000,000 CJ est. value
Fort Bragg, NC 28310

Last Updated 03/30/2023 02:08 PM
Project Title

RFQ D/B - Line 54-Inch Outfall Research to I-95

Physical Address View project details and contacts
City, State (County) East Fayetteville, NC 28301   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Drilling for the authorized subsurface exploration was performed during the period February 25 through March 5, 2021 in conformance with our proposal RD22783R1, dated November 23, 2020. Occasionally some modification to work scopes appearing in our proposals is required to provide for proper evaluation of encountered subsurface conditions. Modification to the scope for this project has included performance of 10 additional moisture content tests for evaluation of subsurface moisture conditions. No other modifications to the work scope were required to complete this work. The purpose of the geotechnical exploration has been to assess general subsurface conditions at specific boring locations and to gather data on which to base a preliminary geotechnical evaluation with respect to the project. Subsurface exploration for this project consisted of thirteen (13) soil SPT borings and three (3) Kessler DCP borings; soil classification has only been performed in the SPT borings. The site was drilled using a CME 550X ATV drill rig equipped with a manual hammer; DCP borings were performed with a hand auger and ASTM compliant dynamic cone penetrometer. Soil boring sites were field located by a representative of our staff using a Garmin GPSmap 64. As such, boring positions appearing on the Boring Location Plan, attached to this report, should be considered approximate. A boring plan was provided to the client prior to commencement of field work. Questions regarding this Request for Qualifications shall be submitted in writing to the attention of Tanya Hazlett via e-mail to tanya.hazlett@faypwc.com, no later than 5:00 p.m., February 28, 2023 Interested firms must email Tanya Hazlett, PWC Procurement Advisor at tanya.hazlett@faypwc.com of their intent to attend. It is the intent of PWC to have the Project substantially complete by April 2027. The milestone completion dates are as follows: o February 2026-Stabilize embankment and maintenance road improvements. o February 2027-Lining the outfall. The estimated budget for this work is $8,600,000

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents