Similar Projects
Buffalo Grove Town Center - Phase II
New Construction, Renovation
Design
Buffalo Grove, IL 60089

St. James Fitness and Recreation Development
Demolition, New Construction, Infrastructure - 435,488 SF
Design
$75,000,000 CJ est. value
Lincolnshire, IL 60069

Classroom and Library Renovations at Round Lake Beach Elementary School
Renovation
Bidding
$200,000 CJ est. value
Round Lake Beach, IL 60073

214 Washington District Office and Wraparound Center Renovations
Renovation
Bidding
$950,000 CJ est. value
Waukegan, IL 60085

Long Range Phase 2 - 2022 Bond - North Shore District 112
Renovation
Sub-Bidding
$118,400,000 CJ est. value
Highland Park, IL 60035

Ravinia Elementary School Additions and Renovations
Addition, Demolition, Renovation, Infrastructure - 70,000 SF
Sub-Bidding
$1,000,000 CJ est. value
Highland Park, IL 60035

Elementary School South - Bid Release 1A Trade Package 09E-1A Athletic Flooring
Renovation, Addition - 18,000 SF
Post-Bid
Vernon Hills, IL 60061

Middle School South and Aspen Elementary
Renovation, Addition - 5,110 SF
Post-Bid
Vernon Hills, IL 60061

Summer 2022 Improvements
Renovation
Results
Lake Villa, Lindenhurst, IL 60046

2022 STEAM at Spencer Loomis ES & MS North and Isaac Fox ES & MS South - Bid Release 1
Renovation, Addition
Results
Hawthorn Woods, Lake Zurich, IL 60047

CVS Office Building - Phase I
Renovation - 15,021 SF
Construction
$800,000 est. value
Buffalo Grove, IL 60089

CVS Office Project Phase II
Renovation - 11,000 SF
Construction
$530,000 est. value
Buffalo Grove, IL 60089

Speedway # 7649 Expansion
New Construction, Demolition - 4,608 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Buffalo Grove, IL 60089

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

2023 Multi-Site Secure Entrance Improvements
Renovation
Bidding
$1,125,000 CJ est. value
Waukegan, IL 60085

Last Updated 02/13/2023 09:42 AM
Project Title

2023 Woodland ELM Administration Office Remodel

Physical Address View project details and contacts
City, State (County) Gages Lake, IL 60030   (Lake County)
Category(s) Commercial, Education
Sub-Category(s) Elementary School, Office
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,061,114 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For 2023 Woodland Elementary Administration Office Remodel This project includes: Remodel three classrooms at East elementary school into new administration offices. Remodel existing administration offices at East Elementary school into a classroom and storage area. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to Woodland School District 50 in an amount equal to ten percent (10%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. The successful bidder is required to pay the general prevailing wage for work as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and shall comply with all applicable Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before August 1, 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents