Reported | 07/09/2022 12:00 AM |
Project Title | 7 Brew Coffee - Site Only |
Physical Address | View project details and contacts |
City, State (County) | Foley, AL 36535 (Baldwin County) |
Category(s) | Commercial |
Sub-Category(s) | Food/Beverage Service |
Contracting Method | Bids by Invitation. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | General Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 29, 2022, the awarded general contractor is still seeking the following trades: Asphalt Landscaping & Irrigation Electrical CMU Bollards Earthwork Utilities *The owner requests that all subcontractor / supplier inquiries be directed to the Awarded General Contractor. Scope Details: Scope of work outlined in the drawings includes, but is not limited to: Site Construction Demolition of Existing Structure or Site Elements Excavating and Backfilling Site Water, Sanitary and Sewer Site Storm Sewer Paving and Surfacing including Site Striping Concrete Curb and Gutter Site Concrete including Sidewalks, ROW improvement and Flatwork Fences & Gates including Trash Enclosure Landscaping Boring IF NEEDED Concrete & Masonry Cast in Place Concrete for Building Foundation Walk-In Cooler Pad Patio Trash Enclosure CMU Metals Bollards Miscellaneous Steel Fabrications Any other miscellaneous equipment required for building installation Wood & Plastic Closed cell insulation crawl space between floor joists Flashing and joint sealers to exterior after building is set Mechanical HVAC Balance and Start-up of RTU - RTU Supplied by 7 Brew Plumbing Final Connections of Water and Sanitary GC to provide and install grease interceptor (sized per plan) Electrical Electrical Services including Final Connections of Building, Equipment and/or Site Signage and Lighting if on Site Roof GC to insure all roof penetrations are dried in properly Pre-Fab Building & Canopy Details Building to be built and installed by 7-Brew (no cranes needed in bid) Building will arrive in 2 parts - bottom box and top box Interiors will be pre-wired, pre-plumbed, with ductwork installed; rooftop unit will be included GC to be responsible for final connections (mostly under building) - to be inspected on site Water - line stubbed down below floor, all pex/color-coded GC to source and install grease trap Electrical - GC will need to run whips in to J boxes from top box and canopies Canopies will be installed by 7-Brew (drill and epoxy); GC to ensure top of footer is at same elevation as finished grade around it Equipment supplier will be in charge of sourcing and installing equipment and tables; GC to run whip from ice machine condenser to disconnect on top box and make final electrical connection to WIC compressor/evaporator (run up side, not through floor) |
||||||||||||||||
Details | Food/Beverage Service, New Construction, Food/Beverage Service, 477 SF New Construction.
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |