Similar Projects
The 600 f/k/a City Center
Renovation - 617,453 SF
Conception
Birmingham, AL 35215

New Mexican Restaurant
New Construction
Conception
Mobile, AL 36695

The Star Uptown / Carraway Hospital Redevelopment
New Construction, Demolition
Design
$300,000,000 est. value
Birmingham, AL 35234

Parkside District - Master Plan
Renovation
Design
Birmingham, AL 35216

Olive Garden
New Construction - 7,818 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Gardendale, AL 35071

Olive Garden / Gardendale
Renovation - 7,818 SF
Bidding
$1,219,608 est. value
Gardendale, AL 35071

Panera Bread #0791 / Montgomery
Renovation - 4,403 SF
Sub-Bidding
$300,000 est. value
Montgomery, AL 36117

Chick Fil-A #1943 / Leeds
Renovation - 4,826 SF
Sub-Bidding
$750,000 est. value
Leeds, AL 35094

Guthrie's
New Construction - 2,092 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Montgomery, AL 36117

Jack's
New Construction - 3,257 SF
Post-Bid
Jackson, AL

Coffee Shop Government Plaza
Renovation - 508 SF
Results
$162,222 est. value
Mobile, AL

Beef O' Brady's
New Construction - 4,808 SF
Results
$1,000,000 to $5,000,000 CJ est. value
Albertville, AL

Burger King
Renovation - 3,586 SF
Construction
$600,000 est. value
Selma, AL 36701

Chick-Fil-A Restaurant
Renovation
Construction
Homewood, AL 35209

Metronome
New Construction
Pending Verification
Huntsville, AL

Reported 07/09/2022 12:00 AM
Project Title

7 Brew Coffee - Site Only

Physical Address View project details and contacts
City, State (County) Foley, AL 36535   (Baldwin County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 29, 2022, the awarded general contractor is still seeking the following trades: Asphalt Landscaping & Irrigation Electrical CMU Bollards Earthwork Utilities *The owner requests that all subcontractor / supplier inquiries be directed to the Awarded General Contractor. Scope Details: Scope of work outlined in the drawings includes, but is not limited to: Site Construction Demolition of Existing Structure or Site Elements Excavating and Backfilling Site Water, Sanitary and Sewer Site Storm Sewer Paving and Surfacing including Site Striping Concrete Curb and Gutter Site Concrete including Sidewalks, ROW improvement and Flatwork Fences & Gates including Trash Enclosure Landscaping Boring IF NEEDED Concrete & Masonry Cast in Place Concrete for Building Foundation Walk-In Cooler Pad Patio Trash Enclosure CMU Metals Bollards Miscellaneous Steel Fabrications Any other miscellaneous equipment required for building installation Wood & Plastic Closed cell insulation crawl space between floor joists Flashing and joint sealers to exterior after building is set Mechanical HVAC Balance and Start-up of RTU - RTU Supplied by 7 Brew Plumbing Final Connections of Water and Sanitary GC to provide and install grease interceptor (sized per plan) Electrical Electrical Services including Final Connections of Building, Equipment and/or Site Signage and Lighting if on Site Roof GC to insure all roof penetrations are dried in properly Pre-Fab Building & Canopy Details Building to be built and installed by 7-Brew (no cranes needed in bid) Building will arrive in 2 parts - bottom box and top box Interiors will be pre-wired, pre-plumbed, with ductwork installed; rooftop unit will be included GC to be responsible for final connections (mostly under building) - to be inspected on site Water - line stubbed down below floor, all pex/color-coded GC to source and install grease trap Electrical - GC will need to run whips in to J boxes from top box and canopies Canopies will be installed by 7-Brew (drill and epoxy); GC to ensure top of footer is at same elevation as finished grade around it Equipment supplier will be in charge of sourcing and installing equipment and tables; GC to run whip from ice machine condenser to disconnect on top box and make final electrical connection to WIC compressor/evaporator (run up side, not through floor)

Details

Food/Beverage Service, New Construction, Food/Beverage Service, 477 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 22 - Plumbing, Plumbing Piping.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents