Similar Projects
Wiley Boulevard Trail From 16th Avenue SouthWest To Williams Boulevard (Highway 151) - 325052 - City Of Cedar Rapids
Infrastructure
Conception
$300,000 CJ est. value
Cedar Rapids, IA 52404

TIF Blairs Ferry Road Improvements And 18th Avenue Extension - 301881 - City Of Cedar Rapids
Infrastructure
Conception
$333,000 CJ est. value
Cedar Rapids, IA 52401

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

Southfork Drive Culvert Repairs
Infrastructure
Bidding
$163,316 CJ est. value
Waukee, IA 50263

HMA Resurfacing / Heater Scarification
Infrastructure
Bidding
$3,500,000 CJ est. value
Sioux City, IA 51104

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

LTC Building Demolition and Grading
Demolition, Infrastructure
Post-Bid
Grundy Center, IA

27th Street Corridor Site Work
Infrastructure
Results
$753,800 est. value
Cedar Falls, IA 50614

Woodbury County Law Enforcement Center Offsite Improvements
Infrastructure
Results
Sioux City, IA 51100

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

SUX Aviation Center Project Rebid
New Construction, Infrastructure - 39,400 SF
Pending Verification
$13,644,584 CJ est. value
Sioux City, IA 51111

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Last Updated 11/02/2022 05:32 PM
Project Title

EFMO - Water System Rehabilitation 36569

Physical Address View project details and contacts
City, State (County) Harpers Ferry, IA 52146   (Allamakee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,894,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November, 02, 2022, project construction could start after the 1st of the year 2023. Award Details Contract Award Date: Sep 14, 2022 Contract Award Number: 140P6022C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: PRBKCK4GXMJ3 Contractor Awarded Name: FRONTIER SERVICES, INC. Contractor Awarded Address: , MO 64145-1446 USA Base and All Options Value (Total Contract Value): $2894000 Solicitation 140P6022R0019 - EFMO - Water System Rehabilitation 36569 at NPS, MWR, Effigy Mounds National Monument, 151 Highway 76, Harpers Ferry, Iowa 52146 This requirement is a Total Small Business set aside under NAICS 237110 - Water and Sewer Line and Related Structures Construction. Contracting POC: Bridget Parizek, bridget_parizek@nps.gov SITE VISIT: Interested contractors are highly encouraged to attend the formal Site Visit. Please see FAR 52.236-27 for Site Visit information. GENERAL INFORMATION: In accordance with FAR 36.204, the magnitude of this project is between $1,000,000 and $5,000,000. This requirement is subject to the availability of funds. CONSTRUCTION DURATION: 240 Calendar Days from Notice to Proceed. It is anticipated that the Notice to Proceed will be issued prior to October 1, 2022. REQUIRED BONDS: The project is subject to the Davis-Bacon Act. Bonds will be Contractor questions regarding this solicitation will be accepted in writing by email to: bridget_parizek@nps.gov. All questions shall be received no later than 5 calendar days following the organized site visit required as follows: Bid Bond will be required - 20% of the bid price. Performance Bond and Payment Bond (SF25a) will be required - 100% of the contract price. TYPE OF CONTRACT: Firm-Fixed Price REQUIRED SUBMISSION DOCUMENTS: 1. Completed CLIN Schedule 2. Signed SF1442 3. Review all required vendor completed sections within the solicitation document and provide all requested documents and information in Section L of the solicitation. 4. Contractor must complete the Limitation on Subcontracting Template (See Attachment 12) Be advised that this requirement may be delayed, canceled, or revised at any time during the process based on decisions related to the Department of the Interior (DOI) and National Park Service (NPS) changes. ALL QUESTIONS WILL BE PRESENTED TO BRIDGET_PARIZEK@NPS.GOV ON THIS PROJECT; DO NOT CONTACT THE PARK. Legacy Doc #: NPS Delivery: 240 Days After Notice to Proceed *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents