Similar Projects
DFCM Construction-WSU Waterline Replacement and Tunnel Work Phase 1
Infrastructure
Bidding
$650,000 est. value
Ogden, UT 84403

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

2020 Water Line Projects - 100 E, 200 E, and 300 E
Post-Bid
Midway, UT 84049

Sand Hollow Regional Pipeline South Connection
Results
$600,000 to $700,000 est. value
Saint George, Washington, UT 84770

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

DFCM Construction-DOC AP and P NUCCC Repipe Potable Water Pipes and Sewer Lines
Results
$829,370 est. value
Ogden, UT 84401

Water Line Pipe and Fittings
Post-Bid
Provo, UT

Zone 1W Tank Transmission Main
Results
Bluffdale, UT 84065

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Construction of the 800 West Improvement Project
Results
West Bountiful, UT 84087

Pressurized Irrigation Metering Project
Post-Bid
Lehi, UT 84043

4150 West Culinary and Secondary Waterline Project (13200 South to 12600 South)
Results
$600,000 to $700,000 est. value
Riverton, UT 84065

Reported 07/02/2021 12:00 AM
Project Title

Mill Creek Drive Water Improvements Project

Physical Address View project details and contacts
City, State (County) Moab, UT   (Grand County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of replacing approximately 12,000’ of old water main pipe along Mill Creek Drive and to the Powerhouse Tank, reestablishing all existing system water main and service lateral connections, and improving fire flow protections by replacing and adding fire hydrants along the Project alignment.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents