Similar Projects
2022 Indoor Air Quality Monitoring System
Renovation
Sub-Bidding
$500,000 CJ est. value
Saint Paul, MN 55111

2022 Customs and Border Protection Camera System Upgrade
Renovation
Sub-Bidding
$300,000 CJ est. value
Minneapolis, MN 55450

Settebello - MSP International Airport - Space LT-2205 Renovation
Renovation - 2,000 SF
Post-Bid
Minneapolis, MN

2021 G Concourse Rehabilitation P5
Renovation
Results
$2,570,000 est. value
MN

2021 Terminal 2 and Outbuildings Miscellaneous
Renovation
Results
$644,000 est. value
Minneapolis, MN

2021 Baggage Claim Ticket Lobby Operational Improvements P2
Renovation, Demolition
Construction
$7,250,000 est. value
Saint Paul, MN 55111

2021 MAC Technology Upgrades - IVISN and TRs
Build-Out, Infrastructure
Results
$2,019,948 est. value
MN

2022 Baggage Handling System
New Construction
Results
$31,425,000 est. value
MN

2021 Safety and Security Center - Phase 1 (ARFF)
Renovation
Results
$28,000,000 est. value
Saint Paul, MN 55111

2022 Baggage Claim/Ticket Lobby Operational Improvements P1/2022 Terminal 1 APD Locker Room Expansion
Addition
Results
$30,500,000 est. value
Saint Paul, MN 55111

2022 Terminal 2 Employee Breakroom
New Construction
Results
Minneapolis, MN

2022 Passenger Boarding Bridge Replacement
Renovation
Results
MN

2022 EMC Roof Replacement and Break Room Remodel
Addition, Alteration
Results
$7,293,000 est. value
MN

Concourse G Rehabilitation P6
Renovation
Results
$2,830,000 est. value
MN

2022 Electrical Substation Replacement P2
Demolition, Renovation, Infrastructure
Results
$3,317,000 CJ est. value
Saint Paul, MN 55111

Last Updated 07/29/2022 07:34 AM
Project Title

2022 Campus Building Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Minneapolis, MN 55415   (Hennepin County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $166,300 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for: This work is related to leak remediation and the maintenance of the exterior of Terminal 2. The work includes, but is not limited to, the removal and replacement of the following: sealant, polyurethane membrane liner. Electrically, this work involves removal, temporary support, and reinstallation of existing heat trace cables. The goal of the MAC for the utilization of Targeted Group Businesses on this project is 10%. Goals for Minority participation in each trade State Requirements: 32% Goals for Female participation in each trade State Requirements: 20% Each bid shall be accompanied by a "Bid Security" in the form of a certified check made payable to the MAC in the amount of not less than five percent (5%) of the total bid, or a surety bond in the same amount, running to the MAC, with the surety company thereon duly authorized to do business in the State of Minnesota. Such Bid Security to be a guarantee that the bidder will not, without the consent of the MAC, withdraw its bid for a period of (70) days after the opening of bids, and, if awarded the Contract, will enter into a contract with the MAC, and in connection therewith, give Payment and Performance Bonds as required by law and on forms furnished to the Contractor by the MAC. In the event the Bidder fails to enter into a Contract, the amount of the certified check will be retained or the bond enforced by the MAC. The Bid Security of the (3) lowest bidders will be retained until the contract is executed, but in no event longer than (70) days. The Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Payment and Performance Bonds furnished as herein provided. The bid of the lowest responsible bidder, provided said low bidder has made a good faith effort to meet the TGB contract goal, will be accepted on or before the expiration of (70) days after the date of the opening of bids. The MAC, however, reserves the right to reject any or all bids and to waive any minor irregularities, informalities or discrepancies.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents