Similar Projects
Foster Branch Addition Water Improvements Lots 1-6
Bidding
Bruceville-Eddy, TX

Construction of Water Improvements - James Killough
Bidding
Bruceville-Eddy, TX

Hydrostatic Pressure Relief System Assessment and Improvements
Post-Bid
Waco, TX 76714

Peach Street Water System Improvements Project
Results
Less than $2,200,000 est. value
Waco, TX

Contract 3 - Water Distribution System
Results
Less than $2,095,898 est. value
Mart, TX 76664

Water Line Improvements Remington Ranch Subdivision
Results
Less than $150,000 est. value
Bruceville-Eddy, TX 76524

Mt. Carmel Valve Replacement Phase II
Results
Less than $125,000 est. value
Waco, TX 76700

Robinson Lux Force Main Reroute
Results
Less than $200,000 est. value
Robinson, TX 76706

Clarifier Telescoping Valves
Results
Waco, TX 76714

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2019 - FM 2113 Utility Improvements Project
Results
Less than $2,100,000 est. value
Hewitt, TX 76643

North ETJ Water System Improvements Project
Results
Less than $2,500,000 est. value
Waco, TX 76702

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Results
Less than $8,102,100 est. value
McGregor, TX 76657

Construction of the 2019 CDBG Elm Mott Water Improvements
Results
Less than $240,000 est. value
Waco, TX 76701

Construction of Foster Branch Addition (Creekside) Lots 7-22
Results
$33,000 est. value
Bruceville-Eddy, TX 76524

Last Updated 04/24/2020 11:59 AM
Project Title

Contract 4 - Transmission Main Replacement

Physical Address View project details and contacts
City, State (County) Mart, TX 76664   (McLennan County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,451,226
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 23,500 linear feet of 16" HDPE water main including associated valves, fire hydrants, service connections, fences, gates and restoration work. The project will include three (3) directionally drilled crossings totaling approximately 1,850 linear feet of 16" HDPE water main.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents