Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrical Repair Medium Voltage Circuits
Alteration
Design
FL 32827

I-Drive Traffic Signal Projects
Infrastructure
Sub-Bidding
$2,244,891 CJ est. value
Orlando, FL 32819

BB Install ED Shore Power at Lake Nona
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Orlando, FL 32827

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Purchase of Six Ground Power Units (GPU)
Term Contract
Post-Bid
$225,000 to $325,000 est. value
Orlando, FL

South Water Reclamation Facility Maintenance Building Improvement and Transformer Replacement Project
Results
$2,286,000 est. value
Orlando, FL 32819

Installation of Emergency Generator Systems at Various Orange County Emergency Shelters(Grant)
Alteration
Results
$1,600,000 est. value
Orlando, Winter Garden, FL 32808

Uninterruptible Power Supply Replacement
Term Contract
Design
Orlando, FL

Storm Rates Overhead Line Construction 2022
Infrastructure
Post-Bid

Electrical Contractor Continuing Services
Term Contract, Alteration
Results
$4,000,000 est. value
Orlando, FL

LED Light Fixtures
Term Contract
Post-Bid
Orlando, FL

Emergency Restoration Transmission and Distribution Construction and Maintenance Services
Alteration
Results
Orlando, FL

Parking Garage Luminaires
Addition, Alteration
Post-Bid
Orlando, FL

South Water Reclamation Facility Programmable Logic Controllers Replacement
Alteration
Results
$2,111,384 est. value
Orlando, FL 32819

Last Updated 04/11/2023 08:56 AM
Project Title

CFX HQ Lighting Retro-commissioning

Physical Address View project details and contacts
City, State (County) Orlando, FL 32807   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 4/10/2023, this project has been cancelled. A timeline for the rebid of this project has not been established at this time. The work consists of providing all labor, materials, equipment and incidentals for the conversion of all existing lighting equipment at the CFX headquarters building (4974 ORL Tower Road, Orlando, FL 32807) to LED fixtures with associated controls. The work includes the removal of the existing lighting equipment For a full version of the invitation for this project including additional information regarding availability of the Bidding Documents, pre-qualification requirements, mandatory pre-bid meeting / site visit, protest procedure, bonding requirements, Equal Opportunity Statement, and D/M/WBE Participation, refer to CFX s web site

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents