Similar Projects
Medium Density Residential
New Construction
Conception
Salt Lake City, UT 84116

Olympia Hills
New Construction
Design
Salt Lake City, UT 84190

Teton Ranch
New Construction
Design
Herriman, UT 84096

Development of Property at West Montrose (765 South 300 West) in SLC
Post-Bid
Salt Lake City, UT 84114

Rehabilitation of Hunter Hollow
Post-Bid
West Valley City, UT 84115

Erin Hills Estates
New Construction
Construction
West Valley City, UT 84128

Wayburn Retreat
New Construction
Construction
Holladay, UT 84117

LHM Jordan Commons
New Construction
Pending Verification
Sandy, UT

Bell Canyon Cove
New Construction
Pending Verification
Sandy, UT

Princeton Terrace
New Construction
Design
Sandy, UT 84070

Bevan Residence
New Construction - 7,398 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Herriman, UT 84065

Valhalla
New Construction
Pending Verification
Herriman, UT

Spring Creek Cove
New Construction
Design
Salt Lake City, UT 84117

New Ronald Mcdonald Nbicu Family Space
Renovation - 33,359 SF
Post-Bid
Less than $2,200,000 est. value
Salt Lake City, UT 84113

Butterfield Property
New Construction
Pending Verification
Herriman, UT

Last Updated 07/13/2020 12:00 PM
Project Title

Tripp Lane Subdivision

Physical Address View project details and contacts
City, State (County) Murray, UT 84123   (Salt Lake County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

10 Single-Family Homes, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents