Similar Projects
Amber Fields Mixed Use Development
New Construction, Infrastructure - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN

Cherrywood Pointe Senior Living Center
New Construction
Design
Bloomington, Minneapolis, MN 55437

Canterbury Crossing Senior Housing
New Construction - 25,850 SF
Design
$500,000 to $1,000,000 CJ est. value
Shakopee, MN 55379

7500 York Cooperative Window And Door Replacement
Renovation
Post-Bid
Edina, MN 55435

MN State Veteran's Home
New Construction, Renovation
Post-Bid
$44,000,000 est. value
Montevideo, MN 56265

The Pointe Minnetonka
New Construction
Construction
Minnetonka, MN 55305

Snelling Yards Senior Living Facility
New Construction
Construction
Minneapolis, MN 55406

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

2901 Chicago Avenue South
Renovation - 71,525 SF
Pending Verification
Minneapolis, MN 55407

Arthur's Senior Care
New Construction
Design
Roseville, MN 55113

VA Home Montevideo, MN - Subcontractor Pre-Qualification Process
New Construction
Post-Bid
Montevideo, MN

Chanhassen Independent Living
New Construction - 166,024 SF
Construction
$30,000,000 est. value
Chanhassen, MN 55317

Boden Senior Living
New Construction
Design
Inver Grove Heights, MN 55076

VA Home Preston, MN - Subcontractor Pre-Qualification Process
New Construction
Post-Bid
Preston, MN 55965

Beehive Homes of Maple Grove Phase 2 Alteration
New Construction, Infrastructure - 11,881 SF
Construction
Maple Grove, MN 55311

Reported 04/28/2022 12:00 AM
Project Title

Onamia Rehabilitation

Physical Address View project details and contacts
City, State (County) Onamia, MN 56359   (Mille Lacs County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

House Exterior: 1 - Remove old windows and frames. Dispose of properly. Provide and install new exterior windows. The MLBO Specified window units are (Thermo Tech Vinyl Windows and Doors). As part of the window replacement; include all framing, insulation and materials required for a complete and thorough replacement. All existing window shutters, exterior siding and exterior finish be brought back to current design and standard as exterior window and door work is completed. 2 - Replace the Patio Doors and frame complete from Dining Area to Deck. Include the lumber and carpentry labor to repair the framing in the opening. 3 - Remove old, provide and install weather stripping on exterior doors. 4 - Install the windows and exterior door frames with low expanding foam. 5- Include all siding materials and repairs. Home Interior: 4 - Repair, prime and paint all walls and ceilings. Entire home interior to be included. 5 - Remove old baseboard and provide and install with new throughout the entire home. 6 - Remove and dispose of all existing carpet. Provide and install new carpet. Include all necessary substrate prep. materials and labor with carpet replacement. 7 - Provide and install new interior trim wherever trim is damaged or removed for windows and door installation. All trim must match throughout the home. Remove old and provide and install new window blinds throughout the entire home. 8 - Provide and install all new smoke / carbon monoxide alarms as code requires. Kitchen: 9 - Remove old cabinets and countertops and dispose of properly. Provide and install new kitchen countertops and cabinets in the same configuration. 9a. alternate #1: Leave cabinets and countertops and make minimal, necessary repairs to the existing cabinets, cabinet doors and countertops.*** 10- Remove and dispose of all lighting. Provide and install new fixtures in same locations as removed fixtures. 11- Remove old door from kitchen to garage and provide / replace door and frame including all new hardware and knob with key. Also, provide lockset for the front door with the same key. 12 - Remove the porcelain floor in kitchen / dining area. Prepare substrate to accept LVT. Provide and install new LVT as color approved by owner. 13 - Remove and dispose of all base trim and replace with new. 14 - Remove and replace the water damaged ceiling and wall sheetrock. The home had water leaks from an outdated shingle roof. The shingles and roofing are new as the roof was redone in November 2021. 15 - Make necessary repairs, provide and paint the ceilings and walls in kitchen and the entire home. Same as line item #4 regarding painting. 16 - Remove the old faucets and provide and install new. Remove damaged waste line below the sink and replace with new. 17 - Perform this plumbing work and all work in accordance with State of MN standards. 18 - Remove and replace the electrical wall switches, receptacles and device plates. Bathrooms: Master and Main bathroom located off the hallway. 19 - Remove and dispose of all old light fixtures in these bathrooms as they have been damaged by water leaks. This includes the vanity lights. 20 - Remove and replace the vanities, countertops, faucets complete in both bathrooms. 21 - Provide and install new flat panel mirrors. 22 - Repair the damaged and water damaged walls and ceilings. 23 - Prepare walls and ceilings in both bathrooms for primer and paint. 24 - Remove old ceiling fans in both bathrooms and install new exhaust fans with lighting. 25 - Provide and install new vinyl flooring in both bathrooms. 26 - Provide and install all new shower and tub accessories in accordance to page 182 of the spec. book. CLEAN THE EXISTING SHOWER AND TUB UNITS. 27 - Provide and install new faucets and plumbing fixtures complete in both bathrooms. 28 - Remove and replace the electrical wall switches, receptacles and device plates in both bathrooms. 29 - Remove and replace the wall cabinets in the bathrooms. Laundry: 30 - Remove old light fixture and replace with new. Include new bulbs in all replaced fixtures. Bedrooms: 31 - Repair walls and ceilings and prepare for primer and painting. Include all labor and materials. 32 - Remove and replace all window blinds. Same as Line Item #7. 33 - Remove and replace the carpet. 34 - Clean all ceiling fans and replace all light bulbs. 35 - Remove shelving as required to paint the ceiling and walls. Re-install shelving after painting the entire rooms. Living Room & Hallway: 36 - Remove and replace existing carpet. Provide and install new carpet complete with transitions for entire floor at entries and or room changes. 37 - Provide paint and labor for the contractor repaired walls and ceilings complete. 38 - Remove and replace the ceiling lights. 39 - Remove and replace the ceiling light/fan combination. 40 - Replace the 3'0" x 6' 8" coat closet door. Include new hardware and knob. 41 - Remove old and replace (1) new closet door and frame. Include new hardware and knob. 42 - (2) Bedroom doors and frames on main hallway need replacement with new passage hardware and knobs. 43 - Paint any other doors and frames that have graffiti on them. Use primer and finish paint as selected by homeowner. Contingency allowance: 44 - Include a contingency allowance equaling 5% of the total project. Specified Product Substitutions: All proposed product substitutions must be approved by the Project Coordinator 5 days or more prior to bid. Any approved substitutions, will be made available to all bidders. Contacts: Interested bidders shall contact Jim Carpenter, Project Coordinator, at 320-532-7432 (office), 320-364-9865 (cell) or at james.carpenter@millelacsband.com to be included on the bidder's list in the event that any addendums are issued for this project. Mobilization: The Contractor shall be capable of mobilizing his equipment and crews within seven days of the receipt of Notice to Proceed. Contractor shall provide means and methods for all building phases of construction.

Details

Assisted Living Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents