Similar Projects
Pomega Energy Storage / Kontrolmatik Technologies Lithium-Ion Battery Factory Phase 1
New Construction, Infrastructure - 650,000 SF
Conception
$350,000,000 CJ est. value
Walterboro, SC 29488

Pomega Energy Storage / Kontrolmatik Technologies Lithium-Ion Battery Factory Phase 2
New Construction, Infrastructure - 350,000 SF
Conception
$190,000,000 CJ est. value
Walterboro, SC 29488

Full Depth Patch-District 6
Infrastructure
Post-Bid

Sewer Upgrades - Sub-Systems 1 East and 3 Contract II
Infrastructure
Post-Bid
$700,000 CJ est. value
Walterboro, SC 29488

Local and State Road Resurfacing
Infrastructure
Results
SC

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Edisto Beach Groin No. 2 Repair
Infrastructure
Post-Bid
$135,250 CJ est. value
Edisto, SC 29438

Repairs to Bay Creek Park Pier
Infrastructure
Results
$275,654 CJ est. value
Edisto Island, SC 29438

RFQ D/B - Design-Build Services for the Transfer Station Improvements Project
Infrastructure, Renovation
Post-Bid
$180,000 CJ est. value
Walterboro, SC 29488

Road Work- Gun Bluff Road Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$69,843 CJ est. value
Edisto Island, SC 29438

Rehabilitation/ Reconstruction Colleton County
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Walterboro, SC 29488

Walterboro Wildlife Sanctuary - Boardwalk Reconstruction
Infrastructure
Results
$1,877,795 CJ est. value
Walterboro, SC 29488

Colleton County High School Track Renovations Project
Infrastructure
Post-Bid
$320,000 CJ est. value
Walterboro, SC 29488

Sc 63 Safety Improvements in Colleton County
Infrastructure
Results
$16,528,304 CJ est. value
Islandton, SC 29475

Edisto EMS Station # 8 Construction
Demolition, New Construction, Infrastructure - 5,175 SF
Post-Bid
$5,556,958 CJ est. value
Edisto Island, SC 29438

Last Updated 07/11/2023 02:34 PM
Project Title

QuikTrip #7134 / Walterboro

Physical Address View project details and contacts
City, State (County) Walterboro, SC 29488   (Colleton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Retail, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes but is not limited to the following: clearing, grading, erosion control, stormwater management, site water and sewer work, curb & gutter, asphalt paving, concrete paving, stone backfill, offsite road work, building concrete footings & slabs, masonry, roofing, caulking and sealants, EIFS, hollow metal doors & frames, finish hardware, aluminum storefront installation, glass and glazing, mirrors, metal studs and drywall, FRP board, acoustical ceilings, hard tile, painting, fuel installation, plumbing, mechanical and electrical work. QuikTrip is requesting the following Alternates: 1.Concrete Paving onsite in lieu of Asphalt Paving (please note #5 below). Marine Limestone Base Course in lieu of ABC base (same thickness as shown on the plans). Recycled Portland Cement Base Course in lieu of ABC base (same thickness requirements). 2.Please include any and all Escalation costs & Fuel surcharges for this project in your proposal. QuikTrip will not pay for any Escalation costs or Fuel surcharges during the project.

Details

1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents