Similar Projects
Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Jackson Pond Expansion Project
Infrastructure
Bidding
$410,000 CJ est. value
Villa Park, IL 60181

Jackson Pond Expansion Project
Infrastructure
Bidding
$410,000 CJ est. value
Villa Park, IL 60181

Sitework, HVAC & Classroom Improvements
Post-Bid
Burr Ridge, Willowbrook, IL 60527

Earthwork
Post-Bid
Glendale Heights, IL 60139

Water Main Replacement
Results
Less than $1,700,000 est. value
Glendale Heights, IL 60139

RR-20-4544 - M-8 Maintenance Facility Westbound Access Road
Renovation
Results
Oak Brook, IL 60521

Mckinley Stormwater Pump Station Rehabilitation
Renovation, Infrastructure
Bidding
$1,400,000 CJ est. value
Elmhurst, IL 60126

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Des Moines Street and Richmond Avenue Water Main Replacement
Infrastructure
Bidding
$1,000,000 est. value
Westmont, IL 60559

75th Street Watermain Lining
Post-Bid
$100,000 est. value
Willowbrook, IL

Last Updated 07/22/2022 03:13 PM
Project Title

Phase II Drainage Project at St James Farm

Physical Address View project details and contacts
City, State (County) Winfield, IL 60190   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Phase II Drainage Project at St James Farm The work to be done for this project consists of the demolition of the existing site pavement and various site items, the repair and replacement of the existing drainage system and the installation of new pavement, site walls and landscaping. Consideration of contract award will likely be made on Tuesday, August 2, 2022. The Forest Preserve Commission reserves the right to reject any or all bids and to waive technicalities Questions shall be directed to Chris Welch at cwelch@dupageforest.org The bids must be accompanied by a 10% bid security. This project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. The contractor shall also abide by the employment of Illinois Workers on Public Works Act (30 ILCS 570, sec 1-7).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents