Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

High Desert Corridor - Los Angeles County Metropolitan Transportation Authority (LA Metro)
Alteration
Conception
$1,000,000,000 est. value
Palmdale, CA

Site Prep SPS Sterilizers and Equipment - Building 126 - 7th Floor
Renovation, Alteration
Design
Long Beach, CA 90822

Residences at Northridge Fashion Center
New Construction
Design
Los Angeles, CA 90081

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Highland High School Site Prep and Improvements for Shade Structures in Outdoor Learning Areas
Infrastructure, Alteration
Bidding
$960,000 est. value
Palmdale, CA 93551

Restroom Renovation at Greenwood Center
Renovation
Post-Bid
$175,000 to $199,000 est. value
Torrance, CA 90503

Community Center Elevator Modernization
Renovation
Post-Bid
$300,000 est. value
Carson, CA 90745

Orchard Dale Elementary School Modernization Project- Sitework
Infrastructure
Results
Whittier, CA 90603

West Parcel Habitat Mitigation & Five Year Maintenance
Infrastructure
Results
$1,050,000 est. value
Walnut, CA 91789

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

The Aster
Renovation - 7,200 SF
Construction
$4,000,000 est. value
Los Angeles, CA 90028

Alameda Corridor Terminus Enhancements - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 est. value
Compton, CA 90222

Lucha Reyes Apartments
New Construction - 4,000 SF
Design
$500,000 to $1,000,000 CJ est. value
Los Angeles, CA 90033

South Gate Middle School - Site Improvements
Infrastructure
Bidding
$1,612,000 est. value
South Gate, CA 90280

Last Updated 07/18/2022 04:54 PM
Project Title

Wende Museum Community Center / Phase II

Physical Address View project details and contacts
City, State (County) Culver City, CA 90230   (Los Angeles County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a mixed-use development in Culver City, California. Working plans call for the construction of a 7,022-square-foot, three-story above grade clubhouse / community center. As of July 15, 2022, a general contractor has been selected. A firm construction timeline has not been released, however it is expected to begin late July or August 2022.. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Clubhouse/Social Club, 3 Stories Above Grade, 7,022 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents