Similar Projects
CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Bidding
$25,000 to $100,000 est. value
Leadville, CO 80461

2020 Service Line Replacement Project
Post-Bid
Centennial, CO

Non-Potable System Water Valve Replacement Project
Post-Bid
Englewood, CO

2020 Waterline Replacement
Results
Centennial, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Well #2 Iron and Manganese Filtration - Yard Piping Project
Post-Bid
Englewood, CO

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

Water Advanced Metering Infrastructure Installation Project YR 2020
Post-Bid
Greenwood Village, CO 80112

PCWSD - 2020 DCIP Water Main Replacement Project
Results
Less than $1,500,000 est. value
Littleton, CO 80123

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

On Call Construction Services - Urgent Water Pipeline Repair
Results
Englewood, CO

Riser Rings
Term Contract
Post-Bid
CO

Large Valve Rehabilitation - Task 2
Results
$2,400,000 to $2,900,000 est. value
Aurora, CO 80040

2021 Capital Improvement Program (CIP) Project in Littleton
Infrastructure
Post-Bid
Englewood, CO

60 Inch Gun Club Pipeline from East 6th Avenue to I-70 Phase 2
Alteration
Results
$7,400,000 to $7,700,000 est. value
Aurora, CO 80040

Last Updated 08/03/2021 02:27 PM
Project Title

2021 Water System Improvement - Central Package

Physical Address View project details and contacts
City, State (County) Aurora, CO 80040   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project is an annual system improvement project that entails rehabilitation/replacement of 6”, 8” and 12” diameter water line within areas that were identified as high priority areas where frequent water breaks have occurred and high failure risks are possible. The issues related to the pipelines could be related to asset age, expansive soils, corroded pipe and appurtenances. This phase of the programed improvements will be within one multi-family complex (Eleven One Eleven) and two commercial complexes (Sixth & Sable Plaza & Quincy Place) and one Arterial Roadway (Potomac St – Alameda to Bayaud).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents