Similar Projects
Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

Pickle & Social
Infrastructure
Design
Buford, GA 30519

Colonial Hotel Streetscape Enhancements
Infrastructure
Bidding
$500,000 est. value
Lagrange, GA 30240

Construction Services - Pineview Trail Project
Infrastructure
Bidding
$200,000 est. value
Powder Springs, GA

Southbridge Infrastructure Improvements
Post-Bid
GA

2020 TSPLOST Sidewalk Improvements
Post-Bid
Thomaston, GA

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

Tarboro Fire Station 18 Parking Lot
Results
White Oak, GA 31568

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Winder Retail Center - Site
New Construction
Construction
Winder, GA

Serenity Courtyard
New Construction - 15,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Macon, GA

Akins Boulevard Extension Project
Infrastructure, Alteration
Bidding
$700,000 est. value
Statesboro, GA 30458

Resurfacing Parking Lot
Post-Bid
Fort Valley, GA

Jekyll Island Beach Crossover Construction
Results
Brunswick, GA 31527

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Reported 05/24/2022 12:00 AM
Project Title

Site Improvements for Westmont Elementary School

Physical Address View project details and contacts
City, State (County) Martinez, GA 30907   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Martinez, Georgia. Completed plans call for site work for a educational facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.The work consists of clearing & grubbing, erosion & sediment control best management practices, asbestos abatement and building demolition, grading, gravity sanitary sewer lines & appurtenances, water lines, storm drainage systems, underground stormwater detention systems, asphalt & concrete pavement, parking lot striping, signage, concrete walks, chain-link fencing, landscaping & irrigation as described in the Contract Drawings and Specifications Under no circumstances shall failure to obtain clarifications and/or addenda relieve a bidder from being bound by any additional terms and conditions in the clarifications and/or addenda, or from considering additional information contained therein in preparing their bid. Furthermore, failure to obtain any clarification and/or addendum shall not be valid grounds for a protest against award(s) made under this request for bids. Bids Must Be Accompanied by a Bid Bond Made Payable to the Columbia County School District in the Amount Not Less Than Five Percent (5%) of the Lump Sum Bid for the Complete Work; Such Bid Bond Representing That the Bidder, if Awarded the Contract, Will Promptly Enter Into a Contract Agreement and Furnish a Performance Bond and Payment Bond, as Provided by Law and Approved by the Attorney for the Columbia County School District. Each Bond Shall Be Equal to One Hundred Percent (100%) of the Contract Amount. The Bid Bond Will Be Forfeited to the Columbia County School District as Liquidated Damages if the Bidder Fails to Execute the Contract and Provide Performance and Payment Bonds Within Ten (10) Days After Being Notified That He Has Been Awarded the Contract. Certified Checks or Letters of Credit Are Not Acceptable. A Surety Company Licensed to Do Business in the State of Georgia and Listed in the Department of the Treasury Circular 570, Latest Edition, Must Execute Bonds. The Surety Company Shall Have an a. M. Best Company Rating of "a" With a Financial Size of Vii "7" or Better. Bonds Must Be Accompanied by a Letter Stating Bonding Company's Current Rating for Verification Prior to Acceptance by the Owner and Execution of the Formal Owner/contractor Agreement. Contractor and Subcontractor Shall Require the Attorneyin-fact Who Executes Bonds on Behalf of Sureties to Attach a Certified Current Copy of His Power of Attorney. The Owner reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or to reject any or all bids and to waive technicalities and informalities. Any objections to the Bid Documents/Specifications as presented should be filed in writing prior to bid opening date.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents