Similar Projects
Solar and Battery Storage Resiliency Project
Alteration
Bidding
Medford, MA 02155

Lighting Fixture Upgrades
Alteration
Bidding
$48,000 est. value
Dracut, MA 01826

Ayer WWTF FY2020 Improvements
Alteration
Sub-Bidding
Less than $2,400,000 est. value
Ayer, MA

LHS Freshman Academy Roof Project - Sub Bid
Alteration
Sub-Bidding
$1,500,000 est. value
Lowell, MA

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Substantial Phased Addition and Renovation to the Existing Belmont High School - Filed Sub-Bids
Post-Bid
Less than $237,000,000 est. value
Belmont, MA 02478

Uninterrupted Power Supply (UPS) with associated Minimum Essential Characteristics
Results
Natick, MA 01760

CWTP Ancillary Mods - Sodium Hypochlorite System Modifications - Filed Sub Bid
Results
Less than $1,860,000 est. value
Marlborough, MA 01752

Electrical Service and Repair
Term Contract, Alteration
Bidding
$15,000 est. value
Winchester, MA

Westview Cemetery Administration Office and Maintenance Garage - Sub-Bids
Alteration
Sub-Bidding
$2,660,000 est. value
Lexington, MA 02420

Solar Energy ABRSD
Post-Bid
Acton, MA 01720

Diesel Generator Maintenance at John J. Carroll Water Treatment Plant
Results
Less than $674,900 est. value
Marlborough, MA

On-Call Generator Services
Alteration
Bidding
$100,000 est. value
Lexington, MA

5kV, 4-Way, Two-Sided, Pad-Mounted Switchgear
Post-Bid
Belmont, MA 02478

Electrical Trade Labor
Results
Lowell, MA

Last Updated 05/21/2021 10:09 AM
Project Title

Transformer Replacement, Lydon Library

Physical Address View project details and contacts
City, State (County) Lowell, MA 01854   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The Project consists of: This project includes de-energizing/disconnecting the existing transformers, replacement of the existing transformers with an outdoor pad mounted transformer, and replacement of the existing circuit breakers in the 208V switchboard with new circuit breakers. UMass-Lowell will take responsibility for removal and proper disposal of the existing transformers.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents