Similar Projects
Terry Sanford High School Kitchen Grease Tray Addition and Kitchen Upgrade/AC
Alteration
Bidding
Fayetteville, NC 28303

Pine Forest Middle School Building 2 HVAC Replacement
Alteration
Bidding
Fayetteville, NC 28311

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

South View Middle School Classroom Area HVAC Upgrade
Results
Hope Mills, NC 28348

Welding-Lawn Equipment Repair Shop A/C Replacement
Post-Bid
Fayetteville, NC 28306

Reported 05/13/2021 12:00 AM
Project Title

Garage Air System Repair

Physical Address View project details and contacts
City, State (County) Fayetteville, NC   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. New air compressor to be installed in the same location as the old air compressor. Demo old air compressor. Make electrical connections safe. Disconnect and remove old air lines. 2. Install new concrete pad for new compressor. New compressor shall be Quincy, Kaishan, or Sullivan Palotek. Compressor shall be 20 HP, Rotary Screw type, 120 gallon receiver tank, 67 scfm @175 psi. 3. Install new 1 ½” NPT black iron pipe air header with ¾” branches to serve ¾” hose reels to be provided by owner. Vendor is to mount the reels. Concept sketch below. 4. Complete electrical installation and provide factory start-up and training.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents