Similar Projects
Millwork, Framing and Drywall On-Call Single Trade Services
Post-Bid
Denver, CO 80202

ACC DQ 20-3-920 Feature Wall
Post-Bid
Denver, CO

Door Replacements - Dunn Elementary School
Results
Fort Collins, CO

Interior Finish Work at FAA's Denver ARTCC's Childcare Facility Located in Longmont, CO
Results
$250,000 to $500,000 est. value
Longmont, CO

Protective Coatings
Post-Bid
CO

Soundproofing of 2nd Floor
Results
Grand Junction, CO 81501

Bvcc Twc Partition Cubicles
Post-Bid
Buena Vista, CO

Waterproofing of Windows and Building Perimeter
Results
Littleton, CO 80120

Flooring Services
Post-Bid
Westminster, CO

Broomfield Flooring and Drywall Replacement Project
Results
Broomfield, CO 80020

Berthoud Headquarters Wall Covering Project
Post-Bid
Berthoud, CO 80513

As-Needed Painting and Drywall Services
Term Contract
Results
Aspen, Carbondale, Glenwood Springs, Parachute, Snowmass, CO

HPER - Massari Arena Divider Curtains - Phase 1
Post-Bid
Pueblo, CO 81001

Annual Maintenance - Resurface/ Refinishing Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

Reported 09/10/2020 12:00 AM
Project Title

Monte Vista Police Department Locker Room Improvements

Physical Address View project details and contacts
City, State (County) Monte Vista, CO 81144   (Rio Grande County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of tasks is described below: 1. Painting: Paint the entire locker room with durable water resistant matching paint. The locker room will be in one color. 2. Flooring: Repair concrete floor (cracks and holes and leveling) and provide and install tile flooring to include trimming. 3. Tape and Texture: Provide and complete tape and texturing. Match rock wall to existing wall. 4. Electrical: Move/close electrical outlets on north wall. Provide and install lights in locker room and over vanity area. 5. Toilet: Provide and install one water efficient toilet and provide and install ADA compliant stall partition. 6. Shower: Provide and install on 48” x 48” ADA compliant shower stall. 7. Vanity: Provide and install a one sink vanity on north wall. Provide and install paper towel dispenser near the vanity. 8. Ventilation Fan: Provide and install one ventilation fan in the shower area.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents