Similar Projects
Louisiana 89 Widening
Infrastructure
Conception
$5,000,000 est. value
Broussard, LA 70518

Verot School Road Extension - City of Youngsville
Infrastructure
Conception
$22,100,000 est. value
Youngsville, LA 70592

US 90: Alex St - US 90 Bus
Infrastructure
Design
$1,000,000 to $2,500,000 est. value
Lafayette, LA 70596

La 353: La 94 to Cypress Island Hwy
Infrastructure
Design
$5,000,000 to $7,500,000 est. value
Lafayette, LA

Construction of Little Missouri Loop Improvements
Infrastructure
Bidding
$280,000 est. value
Mer Rouge, LA 71261

Development of 2312-14 Louisiana Avenue
Term Contract
Bidding
$500,000 est. value
New Orleans, LA 70115

Cold Mix (Colay) and Hot Mix
Infrastructure
Post-Bid
Farmerville, LA

Proposed Street Improvements Drive 4263 PW 910 Paved Roads
Infrastructure
Post-Bid
Benton, LA

Lafourche - Terrebonne Scenic Overlook
Infrastructure
Results
$100,000 to $250,000 est. value
LA

LA 182: 1.8 MI N LA 723 - 0.4 MI S LA 98
New Construction
Results
$1,000,000 to $2,500,000 est. value
LA

I-49 North Inter-City Connector - LaDOTD
Infrastructure
Conception
$100,000,000 est. value
Shreveport, LA 71150

I-12: LA 1077 to LA 21
New Construction, Demolition, Infrastructure
Design
$30,000,000 to $50,000,000 est. value
Mandeville, LA

Lurline Drive Paving and Drainage Improvements, Phase 1 (Kathleen Drive to Karen Drive)
Infrastructure
Bidding
$950,000 est. value
Covington, LA 70433

Emulsified Asphalts
Infrastructure
Post-Bid
DeRidder, LA

I-10 Ramps LA 3019 INT IMP
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
LA

Reported 07/05/2022 01:03 PM
Project Title

Acadian Trail (West Baton Rouge)

Physical Address View project details and contacts
City, State (County) Addis, LA 70710   (West Baton Rouge County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Bidding Expected October 2022, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Addis, Louisiana. Working plans call for site work for a road / highway; and for paving for a road / highway. Type Improvement :Construct Acadian Trail Length 0.62 miles) Parish :West Baton Rouge Estimated Cost Range $500,000 to $1,000,000 As of July 01, 2022, the project is in Final Planning status. Anticipated letting date is October 12, 2022. LADOT - Acadian Trail (West Baton Rouge) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents