Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

Henry Vogt Building AMIST Lab AHU Replacement
Alteration
Bidding
$200,000 est. value
Louisville, KY

HVAC Upgrades
Alteration
Bidding
$200,000 est. value
Hodgenville, KY

Court Complex Duct Cleaning 2021
Term Contract
Post-Bid
Nicholasville, KY 40356

HVAC and Mechanical Products
Term Contract
Post-Bid

Cedar Creek WQTC - Effluent Parshall Flume Upgrade
Results
$1,000,000 to $2,000,000 est. value
Louisville, KY 40291

RCC Move/Install Chillers from KSR Dorms
Results
Less than $150,042 est. value
La Grange, KY

Waterfield Library HVAC Phase II
Alteration
Bidding
$500,000 est. value
Murray, KY 42071

Replacing HVAC Units in All of Boyd County Courthouse
Post-Bid
Catlettsburg, KY 41129

Ahrens Educational Resource Center/J. Graham Brown School HVAC Phase I
Results
Less than $22,000,000 est. value
Louisville, KY 40202

School of Law AHU Replacement
Alteration
Bidding
$300,000 est. value
Louisville, KY

Preventative Maintenance on all HVAC / Mechanical Systems at Michael O. Buchanon Park and Ephram White Park Gymnasiums
Post-Bid
Bowling Green, KY 42101

Ventilation System
Results
Lexington, KY 40508

Elsmere School HVAC and Generator
Alteration
Bidding
$300,000 est. value
Erlanger, KY

Boone County Schools Geothermal Upgrades Phase 2
Post-Bid
KY

Last Updated 05/24/2022 03:39 PM
Project Title

OET HVAC Controls Upgrades and Repairs

Physical Address View project details and contacts
City, State (County) Somerset, KY 42501   (Pulaski County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $225,113
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing the existing building automation control system, which will integrate the existing HVAC equipment - 2-pipe fan coil units, single zone air handling unit, water cooled chiller with remote condenser, and a hot water boiler. The new control system will conform with the State’s CEMCS standard but will not be interfaced under this project with the Commonwealth’s statewide management system. B. Under Alternate #1, the existing indoor chiller and remote refrigerant condenser will be replaced. New chiller will be integrated into new BAS.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents