Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 4030 Carter Avenue Bridge
Demolition, New Construction, Infrastructure
Design
$2,041,940 CJ est. value
Indiana, PA 15701

SR 4030 Carter Avenue Bridge
Demolition, New Construction, Infrastructure
Design
$2,041,940 CJ est. value
Indiana, PA 15701

US 22 Ped/Bike Bridge MTF
Infrastructure
Bidding
$5,000,000 CJ est. value
Burrell Township, PA 15717

US 22 Ped/Bike Bridge MTF
Infrastructure
Bidding
$5,000,000 CJ est. value
Burrell Township, PA 15717

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

AMR Blacklick Creek Treatment Facility
Renovation
Results
$5,000,000 est. value
PA

AMR Taylorsville South
Infrastructure
Results
$100,000 to $200,000 est. value
PA

Broadhead Run Bridge #2
Demolition, New Construction, Infrastructure
Conception
$2,145,300 CJ est. value
Canoe Township, PA 15771

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Demolition of Underutilized and Obsolete Buildings
Demolition, Infrastructure
Bidding
$2,000,000 CJ est. value
Indiana, PA 15701

Bituminous Seal Coating
Infrastructure
Post-Bid
$300,000 est. value
Saltsburg, PA

Indiana Group SIA
Infrastructure
Results
$2,500,000 to $4,999,999 est. value
PA

Last Updated 06/22/2023 04:03 PM
Project Title

Site Improvements Project - McGregor Manor, Point Street and Hemlock Way

Physical Address View project details and contacts
City, State (County) Saltsburg, PA 15681   (Indiana County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $181,450 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of dumpster pad, fencing, timber and masonry retaining walls and sidewalk replacement, painting of electrical meter banks, demolition of storage sheds, installation of underdrain and related construction at the Housing Authority owned apartment complexes located in Saltsburg Borough, Indiana County, Pennsylvania. Bids must be submitted individually on a lump-sum basis for each bid. Separate Bids for individual trades will not be accepted. Projects are to be substantially completed within 180 calendar days from the date of award of Contracts. This contract is federally assisted. The Contractor must comply with the Davis-Bacon Act. A certified check or bank draft made payable to the order of Housing Authority of Indiana County, U.S. Government Bonds, or a satisfactory Bid Security (Bid Bond) executed by the Bidder and an acceptable surety, in the amount equal to ten percent (10%) of the total Bid, must accompany the Bid in accordance with the Instruction To Bidders. No Bid Surety shall be waived or returned because the Bidder has failed or cannot comply with any requirements set forth in the plans, specifications or any applicable statutes of the Commonwealth of Pennsylvania or any applicable municipal ordinances. A Bid may not be modified, withdrawn or cancelled by the Bidder within sixty (60) calendar days following the time and date designated for the receipt of Bids, without the written consent of the Housing Authority. The surety must be a Guarantee or a Surety Company acceptable to the U.S. Government as published in the U.S. Treasury Circular No.576 and must be licensed to do business in the Commonwealth of Pennsylvania. The successful Bidder will be required to furnish and pay for an assurance of completion of project in the form of Payment and Performance Bonds, each in the amount of 100% of the Contract Price; a cash escrow in the amount of twenty percent (20%) of the Contract Price; or an irrevocable letter of credit in the amount of twenty-five percent (25%) of the Contract Price. Attention is called to all Bidders that all applicable Equal Employment Opportunity requirements for federally assisted construction contracts must be complied with. This includes strict compliance with Executive Order 11246, as amended (establishing a goal of 6.9% for female employment and 1.3% minority percentage by craft); Nondiscrimination; Executive Order 11625, Minority Business Enterprise; Executive Order 12138, Women Business Enterprise; Section 3 of the Housing and Urban Development Act of 1968; Civil Rights Act of 1964; Minority Business Participation; and HUD Wage Rate Determination. The Housing Authority of Indiana County reserves the right to waive irregularities and to reject Bids.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents