Similar Projects
Replacement Heaters at the Water Treatment Plant
Bidding
Harbor Beach, MI 48441

Replacement Boilers - Chippewa Hills School District
Bidding
Remus, MI 49340

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

Construction Work for an Energy Performance Contract for Electric/Plumbing/ Mechanical/Build/Appliances
Post-Bid
Saint Joseph, MI 49085

Boiler Replacement for Columbiaville Elementary
Results
Less than $173,250 est. value
Columbiaville, MI 48463

Boiler Controls Upgrade
Results
Dollar Bay, MI 499220350

Boiler Replacements
Bidding
Munising, MI

Mechanical Improvement Projects Services
Post-Bid
Grand Rapids, MI

East McNair Steam Trap Replacement
Results
Less than $185,849 est. value
Houghton, MI 49931

Pump Station Maintenance Program
Bidding
Southfield, MI

Boiler Pre-Pricing Package
Post-Bid
Walled Lake, MI

Replace Bldg. 570 Boiler "Mulligans"
Results
$25,000 to $100,000 est. value
Harrison Township, MI 48045

2021 Mechanical System Improvements
Bidding
Coopersville, MI

Stevenson High School Mechanical Upgrades
Post-Bid
Sterling Heights, MI

DNR Escanaba Field Office Boiler Replacement
Results
Less than $83,955 est. value
Gladstone, MI

Last Updated 05/13/2020 09:18 AM
Project Title

Boiler Replacement Administrative Building

Physical Address View project details and contacts
City, State (County) MI   (Berrien County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demo (2) existing Bryan Boilers and disposal Demo existing pipe, valves, fittings associated with boiler Install (2) new high efficient Lochinvar FTXL850 Boiler, M-13 Safety Controls (2) new variable speed boiler pumps Boilers to be piped in primary secondary configuration New boilers must be provided with BAC Net integration card Install new pipe, valves and fittings associated with new boiler Demolition of existing steel vent up to existing water heater Demo and replace existing gas water heater with new 40 gallon electric New backflow preventer Install new filter feeder provided by customer New PVC venting and combustion air terminated through roof New Condensate neutralizer and condensate piping New gas regulators and venting All electrical work by licensed electrician CSD-1 Emergency Shut Offs Any necessary code updates for boilers Insulate all new piping to match existing Design Drawings and Engineering Core Drilling Wall patching and caulking Roof Work and Flashing Cranes and rigging CSD-1 testing Owner Training Permits All asbestos work and testing by others

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents