Similar Projects
AK BLM GFO 2019(1) Sourdough Creek Campground
Renovation
Design
Glennallen, AK

Alaska Highway MP 1235-1252 Rehabilitation and Alaska Highway MP 1222-1227 Resurfacing and Tetlin National Wildlife Refuge Visitor Center Parking and Site Improvements (WFL)
Renovation, Infrastructure
Bidding
$20,000,000 to $30,000,000 est. value
Fairbanks, AK 99709

Independent Cost Estimator - BR127.5 Bridge Replacement
New Construction, Infrastructure
Bidding
$4,000,000 est. value
Anchorage, AK

AK NPS DENA 10(49), Polychrome Pass Area Improvements
New Construction
Post-Bid
$20,000,000 est. value
Healy, AK 99755

Cushman Street Overcrossing Bridge #1705 Repairs CMGC
Renovation, Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
AK

Point MacKenzie Rail Extension Bridge Repairs
Renovation, Alteration
Results
Matanuska, AK

Construction Management Services for Port MacKenzie Rail Bridge Repairs
Renovation, Infrastructure
Results
Big Lake, AK

M/V Lituya Coatings and Preservation
New Construction, Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value

Remove Lead Based Paint From Bradley Bridge Girders
Alteration
Results
Less than $25,000 est. value
Trapper Creek, AK

Parks Highway Bridge Replacements
New Construction, Infrastructure
Results
$20,000,000 to $30,000,000 est. value
AK

Alaska Class Ferry (ACF) to Construct 8 Single Person staterooms on the Bridge Deck
New Construction, Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Ketchikan, AK

Rehabilitate the Cushman Street Bridge #0390 and Cushman Street Between the First Avenue and Terminal Street Intersections
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Fairbanks, AK

Dowling Road and Seward Highway Interchange Reconstruction
New Construction, Infrastructure
Results
$30,000,000 to $40,000,000 est. value
Anchorage, AK

Last Updated 04/21/2022 02:17 AM
Project Title

Trestles 3A and 3B Approach Replacement

Physical Address View project details and contacts
City, State (County) Anchorage, AK   (Anchorage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $144,819 to $223,779
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consisting of approximately 128 S.Y. of Concrete Approach Apron Removal; 48 C.Y. of Structural Slab– On Grade; 254 S.Y. of Pavement Removal; 291 S.Y. of Remove and Replace Asphalt Surfacing; and other related work.

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents