Similar Projects
HVAC Maintenance Services
Infrastructure
Design
Altoona, Bethlehem, Ephrata, State College, Wyomissing, PA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Boiler Plant Decentralization Phase 1 at Glenside Homes
Results
Reading, PA 19601

Additions and Renovations to the Wyomissing Area Junior/Senior High School - HVAC Construction
Results
Wyomissing, PA 19610

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Construction of Additions and Renovations to the Wyomissing Hills Elementary Center - HVAC
Results
Wyomissing, PA 19610

HVAC & Refrigeration Replacement & Maintenance - NJ, NY & PA / Project # 44-21
Term Contract
Post-Bid
New York, NY

Installation of Bipolar Ionization
Alteration
Results
Less than $365,834 est. value
Fleetwood, PA 19522

First and Second Floors HVAC and Electrical Upgrades
Alteration
Post-Bid
Reading, PA 19601

HVAC Maintenance Work Order Project
Alteration
Results
Reading, PA

Replace HVAC Equipment
Alteration
Post-Bid
Reading, PA

HVAC Air Distribution Cleaning
Alteration
Results
Reading, PA 19606

HVAC Upgrade - Package 3
Alteration
Post-Bid
Reading, PA 19602

Borough Office Building Renovations - HVAC Construction
Alteration
Results
Boyertown, PA 19512

Last Updated 10/21/2022 07:04 AM
Project Title

HVAC Equipment Replacement at Santander Performing Arts Center

Physical Address View project details and contacts
City, State (County) Reading, PA 19601   (Berks County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Architect - 10/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Santander Performing Arts Center invites Bids for the HVAC Equipment Replacement, located at 136 North 6th Street, Reading, PA 19603. Bids will be received for the following Prime Contracts: Contract No. 1: Mechanical Construction Contract No. 2: Electrical Construction Contract No. 3: General Construction All bids shall be enclosed in envelopes (inner and outer) both of which shall be sealed and clearly labeled with the words SEALED BID FOR THE HVAC EQUIPMENT REPLACEMENT AT SANTANDER PERFORMING ARTS CENTER, and the name of bidder and date and time of bid opening, in order to guard against premature opening of the bid. Facsimile bids will not be accepted or considered All bids shall remain firm for sixty (60) days following opening of bids. Each contractor and each sub-contractor shall be licensed in the community where the work will occur. The Contract will be written to retain 10% for each request for payment. When the Contract is 50% completed, one-half of the amount retained shall be returned to the Contractor. However, the Architect must approve the Application For Payment. The Contractor must be making satisfactory progress and there must be no specific cause for greater withholding. The Owner-Contractor Agreement will be the Standard Form of Agreement Between Owner and Contractor AIA Document A101, 2017 edition. The Owner requires that all Bids shall comply with the bidding requirements specified in the Instructions To Bidders. The Owner may, at its discretion waive informalities in Bids, but is not obligated to do so, nor does it represent that it will do so. The Owner also reserves the right to reject any and all Bids. Under no circumstances will the Owner waive any informality which, by such waiver, would give one Bidder a substantial advantage or benefit not enjoyed by all other Bidders Bonding companies for Performance and Payment Bonds must be listed in the U.S. Treasury Circular No. 570. A Bid Bond made payable to the Santander Performing Arts Center, in the amount of 10% of each Base Bid shall accompany each bid, executed by the Contractor and a surety company licensed to do business in the Commonwealth of Pennsylvania, as a guarantee that, if the bid is accepted, the bidder shall execute the proposed contract and shall furnish and pay for a Performance and Payment Bond in the amount of 100% of the Contract Price as security for the performance of the Contract and payment of all costs thereof, upon execution of Contract. If, after thirty days the bidder shall fail to execute said Contract and Bond, the Bid Bond shall be forfeited to the Owner as liquidated damages. The Bid Bond of all bidders, except the three low bidders, will be returned within ten (10) days after the opening of the bids. The Bid Bond of the three low bidders for each prime contract will be returned within three days after the executed Contracts and required bonds have been approved by the Owner. The successful Bidder will be required to file a Stipulation Against Mechanic's Liens prior to commencing work. Bidders can access the site by appointment only. The Bidding Documents and Forms of Proposal may be examined at the following site during regular business hours: Quad Three Group, Inc., 37 North Washington Street, Wilkes-Barre, Pennsylvania 18701, telephone 570-829-4200, facsimile 570-829-3732.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents