Similar Projects
Rock Church Ministries Church
New Construction - 12,000 SF
Conception
$1,500,000 est. value
Davenport, IA 52800

Connect Point Church
Addition - 9,300 SF
Conception
Cedar Rapids, IA 52402

Elevator and Fellowship Hall Addition
Addition
Bidding
Cherokee, IA 51012

2021 Nations Bridge Shower House
New Construction
Post-Bid
Stuart, IA 50250

Miami Lake Park Shower House Facility
New Construction
Post-Bid
$230,000 est. value
Lovilia, IA

Witmer Park Playground and Restroom Improvements
Renovation - 500 SF
Results
$524,000 est. value
Des Moines, IA 50310

Oleson Park Building
New Construction
Results
$400,000 est. value
Fort Dodge, IA 50501

RiverCenter/Adler Theatre Website Redevelopment
Renovation
Post-Bid
$50,000 est. value
Davenport, IA

Dankwardt Park Restrooms Remodel
Renovation
Results
$140,000 est. value
Burlington, IA 52601

Johnston Commons Restroom Shelter Project
Renovation
Post-Bid
$550,000 est. value
Johnston, IA 50131

Camp Dodge Building M-15
Renovation, Alteration
Results
Johnston, IA 50131

Johnson County Conservation - Kent Park Campground Showerhouse
Renovation
Post-Bid
Oxford, IA 52322

Holiday Park Baseball Improvements Phase 6A Maintenance Building Renovation
Renovation
Results
$190,826 est. value
West Des Moines, IA 50265

Williams Lower Level Restroom
Renovation
Results
Davenport, IA 52804

McKinley Restroom Repair
Renovation
Results
Davenport, IA 52803

Reported 06/24/2022 03:19 PM
Project Title

Trinity Lutheran Church - Bathroom Addition

Physical Address View project details and contacts
City, State (County) Creston, IA 50801   (Union County)
Category(s) Entertainment/Recreation, Religious/Funeral
Sub-Category(s) Religious Facility, Restroom/Bath House
Contracting Method Bids by Invitation.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $95,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, renovation and addition to a mixed-use development in Creston, Iowa. Working plans call for the addition of a religious / funeral development; for the demolition of a religious / funeral development; for the renovation of a religious / funeral development; for site work for a religious / funeral development; and water / sewer project. Project put on hold per Architect The Project consists of partial demolition of the former east entry and construction of a Bathroom Addition with basement below. The work includes Demolition, Concrete, Metal fabrication, Wood framing and trims, Asphalt Shingles, Seamless Gutters, Door Systems, Gyp. Board Assembiles, Wall and Floor tile, Paint, Mechanical, Electrical, and Plumbing, Sitework, Ground and Storm Drainage Systems. The Prime Contractor submitting the Bid shall provide and coordinate all Work required for this Project. Starting time for construction shall be within ten (10) days after the written Notice to Proceed is issued. The estimated starting date on site is Monday, April 4, 2022. Preparation and ordering of materials shall occur prior to the start of construction. Substantial Completion of the project shall be no later than Friday December 2 2022 Bidders may seek clarification of the drawings and specifications from the Architect and propose substitutions prior to the opening of Bids until 12:00 Noon, Wednesday, March 2, 2022 at which time no further information will be provided other than what is shown in the Drawings and Project Manual. The purpose for the deadline is to insure adequate time for preparation and issuance of an addendum, if needed, on Friday, March 4, 2022. It is the intention of this request that addenda after this date may not be necessary Bids submitted to the Owner must be accompanied by cash, certified check of the bidder, or a bid bond submitted in a separate envelope in the amount of 5% of the bid and made payable to Trinity Lutheran Church. Such cash, checks or bid bonds will be returned to all except the three lowest bidders within three (3) days after the opening of bids and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted Bidder have executed the Contract, or if no award has been made within thirty (30) days after date of the opening of bids, upon demand of the Bidder at any time thereafter, so long as he has not been notified of the acceptance of his bid. Conditional bids will not be accepted. The right is reserved, as the interest of the Owner may require, to reject any and all bids, to waive any informality in bids received, and to accept or reject any item of any bid unless such bid is qualified by specific limitation. Bids may not be withdrawn for thirty (30) consecutive calendar days of opening. As of June 23, 2022, no new information available

Details

Restroom/Bath House, Addition, Religious Facility, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents